Aerated concrete laying in winter. Is it possible to build a house from aerated concrete in winter

Subscribe to
Join the koon.ru community!
In contact with:

Aerated concrete blocks are considered a popular material for the construction of facilities. I don’t want to say too much, you can turn to the statistics, which say that more than twenty-five percent of buildings for various purposes are being built from it. And all this with a sufficient amount of other types of materials. This demand is due to the block's unusual physical and technical characteristics. Construction work in the season does not cause difficulties. But what if you have to lay aerated concrete in winter?

Features of masonry in winter

Laying of aerated concrete blocks in winter is possible under certain conditions.

Masonry work in winter involves cleaning the surface of the blocks from snow and ice.

The adhesive composition for winter masonry should be developed at low temperature conditions within half an hour from the moment the dry mixture is diluted with water. If the glue is prepared correctly, then its temperature should be between ten and twenty degrees Celsius.

On the block surface, the glue mass is applied with a trowel in the shape of a ladle.

In addition, the material must be warmed up. For this, a frame base is erected near the pallet with material, covered with polyethylene or an awning. Heating is carried out with an electric heating element or a heat gun. Note that weak heating of the blocks significantly reduces the effectiveness of the strength of the seams, which is explained by the crystallization of moisture accumulated in the block pores.

In winter, during masonry work, antifreeze components are added to the glue.


Allowable temperature

Antifreeze additives made by domestic and foreign manufacturers do not always meet the requirements of GOST.

At what temperature can the gas block be laid?

If the adhesive is of high quality, then with its help it is allowed to carry out construction work from aerated concrete material at a temperature of ten to fifteen degrees below zero.

The same indicators give the right to use mixtures for laying blocks in the construction of a low-rise facility at negative temperatures.

The use of a standard (summer) solution in winter, to which the anti-frost additive Antimorosis has been added, makes it possible to guarantee construction until the air temperature drops below fifteen degrees.

The purchase of such additives does not greatly increase the cash costs, since such costs are offset by seasonal discounts in the cost of aerated concrete material.

We conclude that construction in winter from aerated concrete is possible.

Tools

What will be required to carry out the work? Considering that you have to knead the glue, prepare:

  • electric drill with attachment or mixer;
  • container for kneading.

Additionally you will need:

  • a brush with which we will brush off the dust;
  • hacksaw (it is better to use a special one for aerated concrete);
  • a ladle with which the adhesive will be poured onto the block surface;
  • spatulas;
  • hand graters;
  • rubber mallet for aligning blocks;
  • plumb line and building level;
  • puncher.


Selection of adhesives and additives

For the installation of masonry, a thin layer of adhesive should be applied. The usual consumption data for this composition at a thickness of 2 millimeters is significantly reduced when compared with a solution of sand and cement, which allows you to achieve an optimal thermal conductivity.

A high-quality adhesive composition for winter work is distinguished by a high adhesion rate and resistance to moisture and low temperature conditions. These features allow it to be used for filling and leveling surfaces. The adhesive composition is based on a mixture of Portland cement and fine-grained sand.

A special feature is made up of polymer components that increase the adhesive capabilities and improve plasticity. Used when mixing glue and modifiers, with which the appearance of cracks is minimized.

Experts assure that you can use the fast-hardening adhesive until late autumn, while stable positive temperatures remain during the day. The wall installed during the day receives the specified properties until frost, which comes at night. And the weak thermal conductivity of aerated concrete will play a positive role here. It turns out that there is enough time for the glue to fully set.

As a second option, you can consider the use of special additives or frost-resistant adhesives. There are not very many of them, but you will succeed in solving the problem of winter construction.


Block masonry process

Before starting work, the blocks are warmed up, and this process continues during the entire construction. Block material is stored in a heated room. Masonry adhesive is diluted with hot water.

You can store aerated concrete outdoors, it is not necessary to arrange a shed or store the material indoors. The factory packaging will completely protect the material from water. A couple of weeks before the start of work, it is removed, leaving only the upper part. This period will be enough for the material to get rid of excess moisture.

It is believed that at an air temperature of two degrees below zero, the blocks can be kept unpacked for no more than one day.

Starting the continuation of the masonry, you should check how firmly the wall, erected the day before, holds. Testing is performed with a rubber mallet, which is used to hit the top row block. If the blow did not entail separation, the laying can be continued.

Many are interested in whether it is possible to leave a house made of aerated concrete without a roof for the winter? Experienced specialists assure that the construction process should not be stopped if the first floor has no overlap.


In addition, the ideal option would be to create protection for the outer walls with a finishing material before the onset of cold weather.

An unfinished aerated concrete house is being preserved for the winter. An excellent solution is to organize heating at least in the minimum mode so that the aerated concrete walls do not freeze.

When asked whether it is possible to build a house from aerated concrete in winter, experts give an affirmative answer. They assure that there is an opportunity to save on the main material and improve the quality of the masonry, since the construction team will not work at the pace that it is able to demonstrate in the summer. The laying of the aerated block in frost will move more slowly also because the adhesive composition will take more time to set.

Is it possible to leave the walls of aerated concrete for the winter without a roof? Masters do not recommend doing this. But if the circumstances turned out to be higher, then during the conservation, you will have to tightly cover the walls with plastic wrap, reinforcing it from below. To insulate the floor, cover its surface with straw mats, window and door openings are nailed with roofing material or plywood sheets.

Is it possible to lay aerated concrete in winter if there is no way to warm it up? Everyone knows that blocks perfectly absorb moisture, become very fragile in frosty weather, and form small cracks.

It is better not to use the material without preliminary drying. Otherwise, when the air temperature drops below five degrees of frost, masonry should be stopped.

Advantages and disadvantages of winter construction

You will definitely save money on the purchase of materials in winter. Prices will vary within fifteen percent, as the demand for blocks decreases at this time. Even craftsmen can be selected at reasonable prices, since many are out of work in winter.

Cars with loads will easily drive up to the construction site, because the road rolls with snow and freezes, the equipment will not leave large potholes and pits.

But there are certain disadvantages associated with storing the material, preparing it for work and the speed of masonry.


Conclusion

Winter construction is notable for certain difficulties. But if you follow all the technological requirements and rules, then in the spring season you can completely move on to finishing work in order to move to a new house in the summer. Just do not rely too much on your own strength. If you do not have the proper experience in construction, workers should be hired to manage the masonry in the winter. Only they will be able to take into account all the whims of nature and do the job efficiently.

In winter. They build quite a lot. You don't have to go out of town to see this. Look around and see that new buildings are growing at an enviable rate regardless of the season. And have long become popular in the construction of apartment buildings, as well as private country cottages.

Of course, the most favorable for building a house is the warm season. The reliability and quality of the future cottage depends directly on the professionalism of the performers. It is important that they know the nuances of construction in winter and follow certain rules. Therefore, when winter approaches, it is not necessary to postpone the planned construction, but to consult with specialists and select a highly qualified team.

Important points of construction in winter

  • For laying aerated concrete blocks, it is necessary to use glue with antifreeze additives, and when preparing it, use warm water;
  • If the temperature is below -10C °, it is better to postpone the laying of aerated concrete blocks;
  • In the cold season, a high rate of work is important, because with slow laying, the seams may increase;
  • During construction, the mortar can cool down, so sometimes it should be placed in a warm place to thaw. Do not add water to the building mixture, in order to avoid cracks in the spring;
  • On a working day, it is important to prepare the required number of blocks and glue;
  • Place blocks on a surface warmed up and cleaned from snow and ice (reinforced concrete slab or masonry);
  • It is better to postpone the plaster of the facade until spring, so that the moisture contained in the aerated concrete evaporates.

If you have decided to postpone the construction of a house in the spring, we advise you to purchase building materials in the winter in order to get a good discount. If you need help, we will help to resolve this issue in storing the material for this period.

As you can see, building a house in winter has a number of difficulties, but it is not as difficult to solve them as it seemed, the main thing is to follow the technology and follow the rules, and in the spring you can start finishing and repairing, and in the summer you can move into a full-fledged country house.

Aerated concrete laying in winter is accompanied by some difficulties, inconveniences and additional costs. But not everything is so scary, you can cope. To begin with, it is better to start laying in the spring, when there is also more daylight and there are six months of warm days in stock. But what if you still have to build from aerated concrete in the winter?

On the construction site, there must be electricity for heating, warm water, frost-resistant glue for masonry, a good source of lighting and a film that is needed to cover and heat aerated concrete blocks. As you can imagine, due to additional measures related to the heating of materials, the construction speed slows down.

But, in the winter time, good discounts are made on building materials, moreover, many builders are out of work in winter, which increases competition between builders, and they can also make a discount on their work.

At low temperatures, for masonry, you need to use a special frost-resistant glue, which is suitable for working at temperatures down to -15. But all the same, we would not recommend you to masonry below -10.

The cost of glue for winter masonry is only 10-20% more expensive than usual. Differences between winter masonry glue in anti-frost additives: special salt and other components that prevent water from freezing in the glue at low temperatures (down to -15).

You need to prepare the glue only in a plastic container with a lid, and you need to use heated water, with the maximum allowable temperature written in the glue instructions.

Aerated concrete blocks that are to be glued together must be thoroughly cleaned of snow and ice, and they also need to be warmed up.

Cover the aerated concrete pallet tightly with a fire-resistant film or banner, press the ends of the film so that the heat does not go away, and heat the aerated concrete with fan heaters or heat guns. The warm-up time depends on the power of the heating itself, and on the ambient temperature. We recommend that you do the warming up with good quality.

Note that insufficient heating of aerated concrete reduces the strength of the adhesive seams, which is explained by the crystallization of water in the pores of aerated concrete. Be sure to use frost-resistant glue and heat up the aerated concrete normally.

  1. The rows of blocks are thoroughly cleared of snow and ice.
  2. The masonry blocks are pre-heated.
  3. Use only frost-resistant glue for masonry.
  4. The glue is mixed only in a plastic container with a lid.
  5. The glue is mixed with hot water (up to 60 degrees).
  6. Winter adhesive mixtures should be developed as quickly as possible, within twenty minutes.
  7. The temperature of the finished glue should be between 10 and 20 degrees.
  8. To reinforce the strobes and masonry of the first row, a conventional solution with antifreeze additives is used.

In case of long-term storage of gas blocks in winter, keep them closed in their original packaging. If you are planning to lay aerated concrete in the winter in the near future, then in this case it is advisable to remove the side of the package so that the blocks dry out. Fresh factory aerated concrete comes out of the autoclave wet. The top of the blocks must always be covered from rain and snow.

If you talk about conservation briefly, then you need to close the entire upper part of the masonry, including the subwindow areas.

For more details on this issue, see the video from Gleb Green, the main Russian specialist in aerated concrete.

How to build a house from aerated concrete blocks? What is the best masonry mortar to use? Is it necessary? How is aerated concrete laying in winter? Let's try to answer these questions.

Prices

Let's start with a brief overview of the prices for work with aerated concrete blocks. It is needed so that the reader once again appreciates his strengths and thinks whether it is worth trying to do this work with his own hands or it is better to trust the professionals.

Let's clarify: the prices for the Leningrad Region are actual at the time of this writing. In different regions of the country, they can be significantly higher or lower.

Getting Started

Tool

What tool is needed for laying aerated concrete?

  • Mixer or drill with attachment of similar functionality. We have to mix the glue.
  • The container in which we will begin to dilute the glue.
  • Brush for sweeping away dust and debris.
  • Hacksaw. It is better to take a special tool for aerated concrete, but a garden one is also suitable.
  • A ladle with which we have to pour glue onto the blocks.
  • Notched and regular spatulas.
  • Hand grater with sanding mesh.
  • Rubber mallet.
  • Level and plumb line.
  • Wall chaser or puncher.

Masonry

How is aerated concrete masonry carried out?

  1. The foundation is waterproofed... The walls will be porous; we need to prevent water capillary infiltration. Waterproofing material - several layers of bituminous mastic or a couple of layers of roofing material.
  2. Then the first row is laid out strictly according to the level... The first row is laid on a cushion of cement-sand mortar (1: 3) with a thickness of at least 2 cm; it compensates for unevenness in the base.

Vertical seams are coated only and exclusively with special glue; the following rows are placed on it. The instruction is due to the fact that the glue allows you to ensure the minimum thickness of the seam, which makes the masonry smoother and reduces heat loss.

  1. With bandaging of vertical seams relative to the first row, corner blocks are laid... Then a mooring is pulled between them - a cord along which the row will be aligned.

The further is quite common - row by row, with the obligatory dressing of the seams by at least 8 cm and careful adjustment of the blocks using a mallet. The solution is poured onto the surface of the block with a bucket and spread with a notched trowel. The maximum seam thickness is 3 millimeters.

  1. Above the window and door openings, special elongated U-shaped blocks are laid - lintels.

Insert partitions

Internal load-bearing walls and partitions are erected with a tie-in to the external ones. For this purpose, the blocks of the outer main wall are selected from the inside to the thickness of the partition; the first blocks in each row go into the recess and sit on the glue.

Reinforcement

How to reinforce aerated concrete masonry? Where exactly should the fittings be present?

Please note: in all cases, the groove or the cavity with the laid reinforcement is filled with a cement-sand mortar.

Internal partitions are tied to the walls in the simplest way - with pieces of reinforcement driven into pre-drilled holes, which are connected to the longitudinal reinforcement of the partition.

Features of winter masonry

Construction work in frost is hampered by the rapid freezing of mortar and glue. Is it possible to build aerated concrete walls in winter?

What is the difference between winter masonry?

  • Blocks are preheated... For this purpose, a frame is constructed around the pallet, covered with plastic wrap or tarpaulin; the air in it is heated by heating elements, a heat gun or a conventional fan heater.
  • Only frost-resistant glue is used... The corresponding solutions are present in the assortment of all major manufacturers; their price is 10-15 percent higher than that of conventional solutions. Most of the winter adhesives allow you to work at temperatures down to -15 degrees.

  • A container with a tight-fitting lid is used for the glue.... When mixed, it is diluted with hot water.
  • For the preparation of a cement-sand mortar (for laying out the first row and filling the strobes with reinforcement), antifreeze additives are used.

Construction work at temperatures below the working temperature of the adhesive is not recommended. Even if the adhesive sets, the overall strength of the joints will suffer due to the crystallization of unbound water in the pores.

Treatment

How to cut technological holes in the masonry for laying communications or openings?

Aerated concrete is drilled with any drills and crowns without using the percussion mode. The ideal option is to use a diamond tool. Diamond drilling of holes in concrete leaves the edges of the hole perfectly straight; in addition, drilling with a diamond bit (as, by the way, and cutting reinforced concrete with diamond wheels) allows the reinforcement to pass through without changing the tool.

Conclusion

It is possible that, having found out how much aerated concrete laying costs, the reader will prefer to use the services of professionals. If he takes up the work on his own, we hope that our recommendations will be useful.

As usual, the video in this article contains additional thematic information. Good luck!

Is it possible to build a house in the winter?


The construction of a private house is a complex process, the duration of which depends on many factors. It is not always possible to finish the construction started in spring before the onset of cold weather. Many developers are wondering if it is possible to build a house in winter. They do not want to drag out the work and at the same time are afraid to make a mistake. Thanks to modern technology, it is possible to erect buildings all year round.

Construction in winter - general specifics of work

Crystallization of water entering concrete is a major problem during construction in winter. Without the use of modern methods and the use of modifiers, the increased moisture in the volume can disrupt the integrity of the concrete mass.

Regardless of whether brick blocks are used to build a house or concrete is used, the following conditions must be met:

  • adhere to technological recommendations for performing work in cold weather;
  • provide a heat-insulated room for construction personnel;
  • provide a level of illumination that allows you to work with the onset of darkness.

Despite the seasonal nature of construction works, winter is not an insurmountable obstacle to their implementation.

The general algorithm for erecting a building in cold weather, regardless of the materials used, includes the following stages:

  • obtaining permits. Registration of a building certificate is in no way connected with the season. You just need to develop a project in a timely manner and submit the necessary documents for registration;
  • purchase and delivery of the necessary materials to the site. Costs will be significantly lower due to seasonal discounts. Transporting materials in winter can be much easier, since muddy roads will not interfere with vehicle access;
  • execution of earthworks related to the arrangement of the foundation. Subzero temperatures make it easier to work on loose soils. The use of concrete with additives allows the foundation to be poured at temperatures down to -20 ⁰С;
  • erection of main walls and construction of a roof. In the construction of load-bearing walls and partitions, a heated mortar or concrete composition with the addition of plasticizers is used. In wooden beams used in frost for building a roof, the concentration of moisture is minimized as much as possible;
  • implementation of roofing measures and finishing. Not all roofing and finishing materials allow their use at negative temperatures. To carry out work in the winter, you should choose the right materials.

To use concrete at low temperatures, modern methods can be applied:

  • add additives to the concrete mixture that increase the frost resistance of the composition. This will allow construction activities to be carried out at a lower temperature;
  • heat up the concrete at the stage of its preparation. After pouring, the solution must be thermally insulated so that it completely hardens before water freezes;

Most of the problems associated with winter construction are caused by the property of water to freeze at temperatures below zero degrees.

  • perform electrode heating by passing current through steel electrodes. The supply voltage is supplied from a step-down transformer;
  • use sources of infrared radiation. They allow you to perform directed heating of the array, as well as increase the temperature of the concrete through the formwork;
  • use a heating cable. It is laid in loops with equal intervals between turns before the start of concreting, and heats up the concrete solution when voltage is applied;
  • install the heating formwork. It consists of standard sections, which are equipped with electric heaters and can be easily combined into a single structure.

Using these methods, you can provide the necessary conditions for the concrete solution.

Winter building - pros and cons

Carrying out concrete measures in the winter, you can appreciate the following advantages:

  • preservation of the landscape of the site. At low temperatures, it will not suffer as a result of moving construction equipment on frozen soil;
  • ease of delivery of building materials. Strong and dry road surface and absence of muddy roads provide the possibility of accelerated transportation;
  • significant savings. The cost of building materials in winter is much lower than the rest of the time;
  • reduction in the duration of work. Building a box in winter will allow you to quickly start finishing with the onset of spring.

The construction of residential buildings has a number of specific requirements that prohibit certain types of construction work in winter.

Along with the advantages, there are weaknesses:

  • additional costs associated with the use of plasticizers and increased energy consumption;
  • the need to use professional equipment for warming up and attracting specialists;
  • reduced daylight hours and unfavorable weather conditions that negatively affect the pace of work.

Using specific examples, we will consider the possibility of using various materials at low temperatures.

Is it possible to build a house in winter from foam blocks

Foamed blocks are a type of porous concrete. They are characterized by increased performance characteristics: heat-saving properties, high sound insulation, do not shrink. However, foam blocks have increased water absorption, to prevent which it is necessary to protect the surface.

In winter, you can lay foam blocks. It is important to consider the following points:

  • use a solution or glue with frost-resistant characteristics;
  • erect a tent-type frame-film structure over the masonry;
  • protect the surface of the blocks from moisture with an external cladding.

These measures increase the construction budget.

Masonry blocks should not be damp and covered with snow