Sample job description for installer of low-current systems. Installer job description

Subscribe
Join the “koon.ru” community!
In contact with:

These instructions for labor protection for the installer for the installation of steel and reinforced concrete structures available for free viewing and downloading.

This labor safety instruction for an installer for the installation of steel and reinforced concrete structures has been prepared on the basis of SP 12-135-2003 “Labor safety in construction. Industry standard instructions on labor protection", containing industry standard instructions on labor protection - TI RO 041-2003, taking into account the requirements of current legislative and regulatory legal acts containing state regulatory requirements labor protection specified in Appendix 1 and is intended for the installer for the installation of steel and reinforced concrete structures (hereinafter referred to as the installer) when he performs work according to his profession and qualifications.

1. GENERAL OCCUPATIONAL SAFETY REQUIREMENTS

1.1. Workers at least 18 years of age who have undergone appropriate training, have professional skills to work as installers and have no gender contraindications for the work performed, before being allowed to work independent work must pass:
- mandatory preliminary (upon admission to work) and periodic (during labor activity) medical examinations (examinations) for recognition as fit to perform work in the manner established by the Ministry of Health and Social Development of Russia;
- education safe methods and methods of performing work, instruction on labor protection, on-the-job training and testing of knowledge of labor protection requirements.
1.2. Installers are required to comply with safety requirements to ensure protection from the effects of hazardous and harmful production factors associated with the nature of the work:
— location of workplaces at a significant height;
— moving structures;
— collapse of loose structural elements of buildings and structures;
— fall of overlying materials and tools.
1.3. To protect against mechanical influences, installers are required to use the following provided free of charge by employers:
— signal suits of the 3rd protection class;
- mittens with palms made of vinyl artificial leather-T intermittent or gloves with polymer coating;
— leather ankle boots with non-slip soles or rubber boots;
— safety glasses;
— signal vests;
— safety belts.
When performing work on driving fasteners (dowels) with a construction and installation gun:
— combined mittens instead of mittens with palms;
— anti-noise headphones with fastening to the helmet;
— protective shields.
For outdoor work in winter, you should use the additional provided:
— signal suits with insulating lining of the 3rd protection class;
— felt boots with rubber bottoms or insulated leather boots with a hard toe box;
- gloves with protective coating, frost-resistant, with woolen liners.
Installers must wear safety helmets while on the construction site.
1.4. While on the territory of a construction (production) site, in production and service premises, work areas and workplaces, installers are required to comply with the internal rules labor regulations adopted in this organization.
The admission of unauthorized persons, as well as workers in a state of intoxication, to the specified places is prohibited.
1.5. In the course of their daily activities, installers must:
— use small-scale mechanization tools during work, for their intended purpose, in accordance with the manufacturer’s instructions;
— maintain order in workplaces, clear them of debris, snow, ice, and prevent violations of the rules for storing materials and structures;
- perform only the work assigned by the work manager;
— be careful while working and avoid violating labor safety requirements.
1.6. Installers are obliged to immediately notify their immediate or superior manager of any situation that threatens the life and health of people, of every accident that occurs at work, or of a deterioration in their health, including the occurrence of an acute occupational disease (poisoning).

2. OCCUPATIONAL SAFETY REQUIREMENTS BEFORE STARTING WORK

2.1. Before starting work, installers must:
— present to the manager a certificate of testing knowledge of safe work methods and undergo training at the workplace, taking into account the specifics of the work performed;
— put on a helmet, overalls, and safety shoes of the established standard;
- receive an assignment to perform work from a foreman or manager.
2.2. After receiving the task, installers are required to:
— prepare necessary funds personal protection, including: safety belt and safety rope - when performing steeplejack work; safety glasses - when punching holes in reinforced concrete structures;
- check workplace and approaches to it for compliance with security requirements;
— select the technological equipment and tools necessary to perform the work, check them for compliance with safety requirements;
- inspect the elements building structures intended for installation and ensure that they are free of defects.
2.3. Installers should not begin work when:
- malfunctions of technological equipment, protective equipment for workers specified in the manufacturers’ instructions, in which their use is not allowed;
— untimely carrying out of regular tests of technological equipment, tools and devices;
— untimely carrying out of regular tests or expiration of the service life of protective equipment for workers, established by the manufacturer;
— insufficient lighting of workplaces and approaches to them.
Detected faults must be corrected on our own, and if it is impossible to do this, installers are required to inform the foreman or work manager about them.

3. OCCUPATIONAL SAFETY REQUIREMENTS DURING WORK

3.1. During the installation of structures, installers must be on previously installed and securely fastened structures or scaffolding means.
3.2. To enter the workplace, installers must use equipped access systems (stairs, ladders, bridges).
The presence of installers on elements of building structures held by a crane is not allowed.
3.3. Overhead mounting platforms, ladders and other devices necessary for installers to work at height should be installed and secured to the structures being mounted before they are lifted.
3.4. Workplaces and passages to them, located on ceilings, coverings at a height of more than 1.3 m and at a distance of less than 2 m from the height difference, must be fenced with protective or safety fences, and at a distance of more than 2 m - with signal fences, appropriate requirements state standards.
3.5. In the absence of fencing for workplaces at height, installers are required to use safety belts complete with a safety device. In this case, installers must comply with the requirements Standard instructions on labor protection for workers performing steeplejack work - TI RO 055-2001.
3.6. The elements of building structures to be installed must be cleaned of dirt and ice before they are lifted.
3.7. When installing structures, signals to the crane operator must be given by only one person: when slinging products - by the slinger, when installing them in the design position - by the foreman or team leader, except for the “Stop” signal, which can be given by any employee who notices an obvious danger.
3.8. In the process of moving structures to the installation site using a crane, installers are required to observe the following dimensions for their proximity to previously installed structures and existing buildings and structures:
- permissible approach of the crane boom - no more than 1 m;
— the minimum gap when moving structures over previously installed ones is 0.5 m;
— the permissible approach to the rotating part of the load-lifting crane is at least 1 m.
3.9. Preliminary guidance of the structure to the installation site must be carried out using guy ropes of hemp or nylon rope. During the process of lifting and delivering and guiding the structure to the installation site, installers are prohibited from wrapping the end of the rope around their hand.
3.10. Before installing the structure in the designed position, installers are required to:
— inspect the installation site of the structure and check the presence of alignment and geometric axes on the supporting surface;
— prepare the necessary equipment for its design or temporary fastening;
— check that there are no people below, directly below the installation site of the structure. It is prohibited for people to be under the mounted elements until they are installed in the design position and finally secured.
3.11. When installing elements of building structures in the design position, installers are obliged to:
— guide the structure to the installation site without using significant physical effort;
- carry out the final alignment of the alignment and geometric axes using a mounting crowbar or special tool(conical mandrels, assembly plugs, etc.). It is not allowed to check the alignment of the holes with your fingers.
3.12. After installing the structure in the design position, it is necessary to secure it (permanent or temporary) in accordance with the requirements of the project. At the same time, the stability and immobility of the mounted structure must be ensured when exposed to installation and wind loads. Fastening should be done to previously fixed structures, ensuring the geometric immutability of the assembled building (structure).
3.13. Unslinging of structural elements installed in the design position should be carried out after their permanent or temporary fastening in accordance with the design, subject to the following safety requirements:
— unfastening of structural elements connected with rivets or bolts of increased strength, in the absence of special instructions in the project, should be done after installing at least 30% of the design rivets or bolts in the connecting unit, if there are more than five of them, in other cases - at least two;
— unfastening of structural elements secured by electric welding and bearing the installation load should be done after welding with design seams or tacks according to the project. Structures that cannot withstand installation loads may be straightened after tack welding with a length of at least 60 mm.
3.14. Temporary fastening of mounted structures is permitted to be removed only after they have been permanently fastened in accordance with the requirements of the project.
3.15. When constructing buildings using the method of raising floors (floors), installers are obliged to:
— before lifting the floors, remove all protruding parts on the columns that impede the lifting of structures, and also remove the wedges between the floor slab and the stiffening core;
— prevent distortions of the lifted floors due to asynchronous operation of the lifting equipment;
— at the end of the shift, ensure that the lifted ceiling is supported by the building frame or fixed traction supports;
— in the event of a malfunction of the lifting equipment, ensure that the floor being lifted is supported by the columns of the building frame to which the failed lifts are attached.
3.16. When lifting structures with two cranes, installers are required to carry out slinging, lifting, lifting and installation of the structure in the design position under the direct supervision of the person responsible for safe production works on moving cargo by crane.
3.17. When installing structures by helicopter, installers are required to:
- use forced guidance of mounted structures to the installation site using special catchers or remote control guidance process;
- do not allow flexible guy wires to be secured in advance installed structures.

4. OCCUPATIONAL SAFETY REQUIREMENTS IN EMERGENCIES

4.1. In cases where a malfunction is detected in a load-lifting crane, rail track, lifting devices or technological equipment, installers are required to give the crane driver the “Stop” command and notify the work manager about this.
4.2. If an unstable position of mounted structures, technological equipment or protective equipment is detected, installers must notify the work manager or foreman about this.
4.3. When it changes weather conditions(increasing wind speed to 15 m/s or more, during snowfall, thunderstorm or fog) that impairs visibility, work must be suspended and reported to the supervisor.

5. OCCUPATIONAL SAFETY REQUIREMENTS AFTER WORK COMPLETION

5.1. Upon completion of work, installers are required to:
— put technological equipment and protective equipment for workers in the designated storage area;
- clear of waste building materials and mounted structures, workplace and put it in order;
- inform the manager or foreman about all problems that arise during the work process.

Thanks to Sergei for this occupational safety instruction 😉

Standard instruction No. 10 on labor protection for assemblers in the installation of steel and reinforced concrete structures

Approved

Federal Highway Department

General requirements

1. Persons at least 18 years of age who are recognized as fit for this work by a medical commission, who have undergone training in safe methods and techniques of work, occupational safety instructions and who have a certificate for the right to work as an installer of steel and reinforced concrete structures are allowed to independently work on the installation of steel and reinforced concrete structures. .

2. A newly hired installer is allowed to work only after he has completed an introductory briefing on occupational safety, fire safety, industrial sanitation, environmental requirements, working conditions, provision of first aid and initial training in the workplace.

3. If the work is monotonous (at the same workplace, performing the same types of work using the same equipment, mechanisms, etc.), the installer receives repeated instructions from the supervisor at least once every three months.

4. If the installer violates the requirements of current norms, rules and instructions on labor protection, as well as when working conditions change, an unscheduled briefing is carried out.

5. Testing of the installer’s knowledge of labor protection is carried out annually. Conducting all types of instruction and the results of knowledge testing are recorded in journals and cards in the prescribed form.

6. Individuals who are not younger than 18 years old and not older than 60 years old, who have passed a medical examination, have at least one year of experience in steeplejack work, and tariff category not lower than third.

7. Persons performing work at a height of more than 5 m must additionally complete a training course and have a certificate for the right to carry out steeplejack work.

8. When installing suspended formwork, installation at a height of more than 8 m is carried out by trained climbers using safety belts attached to reliable supports.

9. The installer for the installation of steel and reinforced concrete structures must:

Keep your work area clean and tidy at all times;

Do not block passages and passages with materials and structures;

Place the tools and devices necessary for work, as well as materials and structures in a convenient and safe place;

Have at the workplace individual means to provide first aid to victims.

10. The installer for the installation of steel and reinforced concrete structures is obliged to:

Comply with the requirements of safety signs;

Do not start work without fencing off hazardous areas at the workplace, without personal protective equipment (helmet, overalls, safety shoes, safety equipment) provided for by standard industry standards, the nature of the work performed and the collective agreement;

Perform only the work for which you have been instructed and authorized to work;

Do not follow instructions and orders if they contradict labor safety rules;

Provide first aid to the injured person at work, take measures to eliminate violations of safety and labor protection requirements;

Follow the internal labor regulations and instructions of the foreman (foreman);

Use personal and collective protective equipment; take care of the safety of one’s own work and fellow workers;

Have the first safety qualification group.

11. Workplaces are provided with tested inventory fencing and devices for working at height (scaffolding, scaffolding, ladders, stepladders, cradles, etc.), installed in accordance with the work project. Open openings, holes, trenches, etc. must be covered with protective devices (railings, nets, shields, canopies).

12. Workplaces, passages and passages in dark time days should be illuminated, and in the most dangerous places- light signals are installed. It is prohibited to carry out installation work in unlit places.

13. When performing work in especially dangerous and harmful places, the installer is given targeted instructions and issued a written permit, which defines safe working conditions, indicates dangerous zones and places, and defines the necessary measures for safe methods and techniques for performing work.

14. At the workplace, the installer must have all the necessary working individual and collective protective equipment, tools, removable load-handling devices, as well as a list of goods moved by the crane, indicating their weight and dimensions.

15. When combining work along the same vertical, workplaces must be equipped with appropriate protective devices.

16. Passages located on ledges, slopes and slopes with a slope of more than 20° must be equipped with stepladders or stairs with one-sided railings.

17. To move the installer from one structure to another, located at a height of more than 1 m, trawls, ladders, walkways with railings.

18. It is prohibited for the installer to cross installed elements and structures that do not have guardrails.

19. Workers who have undergone industrial training and have the appropriate certificate for the right to use them are allowed to work with power tools.

20. The use of tools with mechanical, electric and pneumatic drive is allowed only in accordance with the purpose and requirements specified in the passport and manufacturer’s instructions.

21. When taking breaks from work or moving a power tool to another place, it must be turned off. It is prohibited to leave a power tool with the engine running without supervision, or connected to an electrical or compressed air network.

22. Connect (disconnect) auxiliary equipment(step-down transformers, frequency converters, etc.), and only the electrician on duty should troubleshoot it.

23. Tools used for aligning and aligning holes when installing structures (crowbars, plugs, mandrels, etc.) must not be bent, not knocked down, have no cracks or burrs.

24. Wooden handles of hammers and sledgehammers must be smoothly processed, adjusted and securely fastened.

25. Wrenches should be selected based on the size of the nuts and bolts.

Prohibited:

Use wrenches with a lining of metal plates between the edges of the nut and the wrench, and also lengthen the handles of the wrenches;

Use damaged or faulty tools that have dents, chipped working ends, sharp edges where you grip them by hand, or bevels. work surface, cracks, etc.

Requirements before and during work

26. Before starting work, an installer installing steel and reinforced concrete structures must:

Receive instructions from the master about safe ways fulfillment of the received task;

Inspect and try necessary tools and devices (jacks, hand and electric winches, blocks, etc.), make sure that they are in good condition, and replace those that are unusable;

Get a safety belt, helmet, overalls, gloves, etc. and make sure they are in good working order. Wear protective clothing.

The safety belt issued to the installer must have a passport and every 6 months be tested with a static load (300 kg) for 5 minutes; a belt in operation must be inspected at least once every 15 days. The safety belt must be marked with the belt number and the date of its test. It is prohibited to use belts that are damaged, as well as belts that have expired after the last test. The installer must be firmly secured by the safety belt chain to fixed structures. The places where the safety belt carabiner is attached must be indicated in advance by the foreman or the workman;

Inspect your workplace, make sure that scaffolding, decking and fences are in good condition.

27. Workplaces and passages to them at a height of more than 1.0 m and a distance of less than 2 m from the height difference must be fenced temporary fencing. If it is impossible to install fences, work at height must be carried out using safety belts.

28. Work on lifting erected structures must be carried out at the command of one person.

29. The installer should not turn on and off lifting mechanisms, unauthorized dismantling of scaffolding and fences.

30. It is not allowed to use lifting mechanisms to lift and lower people, or to work from unsecured structures or from scaffolds mounted on these structures.

31. It is prohibited to stand under mounted structures and the boom of the lifting mechanism.

32. The installer must wear non-slip shoes.

33. Climbing the installer onto the scaffolding is allowed only using ladders (ladders) with handrails.

34. The total length (height) of the extension ladder must provide the installer with the opportunity to work while standing on a step located at a distance of at least 1 m from the upper end of the ladder.

35. Bottom ends ladders should have stops in the form of sharp metal spikes or rubber tips, depending on the material and condition of the supporting surface, and the upper ends should be fixed to durable structures(scaffolding, beams, frame elements, etc.).

36. The installer must move mobile scaffolding smoothly, without jerking, using winches or other mechanisms, under the guidance of the work foreman or foreman. It is not allowed to move scaffolding in wind force of more than 3 points. It is prohibited for people to be on the scaffolding while they are moving.

37. Floorings of scaffolding, scaffolding, stepladders, cradles located above 1 m from the ground level or ceiling must be fenced.

The structure of the fence (railing) must consist of posts, a handrail located at a height of at least 1.1 m from the working floor, one intermediate horizontal element and a side board at the base with a height of at least 15 cm.

38. Floorings and stepladders of scaffolding and scaffolding must be kept clean. IN winter time, they should be cleared of snow and ice and, if necessary, sprinkled with sand.

39. Strengthening the hooks, clamps and fingers of suspended scaffolding on the mounted structural elements must be done before they are lifted.

40. Communication between tiers of suspended scaffolding should be carried out using ladders securely fixed at their upper ends.

41. It is prohibited to connect adjacent sections of lifting scaffolding and cradles with each other using transitional platforms (ladders).

42. The installer must ensure that movement steel ropes when raising and lowering lifting scaffolds and cradles it was free. Rubbing of ropes against protruding structures is not allowed.

43. While lifting cradles, only the workers performing the lifting are allowed to remain in them.

Cradles from which work is not performed must be lowered to the ground.

44. Execution is prohibited installation work at an altitude of open places with a wind force of 6 points or more (wind speed 9.9-12.4 m/sec), as well as during icy conditions, heavy snowfall, rain and thunderstorms. When installing vertical blind panels, work stops when the wind force is 5 (wind speed 7.5-9.8 m/sec).

45. The installer must ensure the correct storage of concrete and reinforced concrete structures delivered to the site in compliance with the following requirements:

Unloading of structures should be carried out on a leveled surface, and in winter on a surface cleared of snow and ice;

The height of stacks of foundation blocks and reinforced concrete rings should not exceed 2.2 m; pipe links are laid in a vertical position in one row or in a horizontal position with linings, a wedge against rolling out and with end stops;

When storing structures in two or more tiers, it is necessary to ensure that the rows are horizontal, preventing the possibility of spontaneous sliding of the structures;

Stacks of structures must be located from the edge of the pit at a distance that excludes the possibility of its walls collapsing, but not less than 1 m;

Between the stacks of laid structures there must be a passage at least 1 m wide.

46. ​​Before installing block structures and other prefabricated elements of reinforced concrete pipes, the mounting loops must first be cleared of mortar or concrete, straightened and carefully inspected.

47. Installation of reinforced concrete pipes in the event of damage and the absence of mounting loops on the structural elements of the pipes should be carried out with special grips or slings with a girth, ensuring lifting in the position necessary for installing the structures in place.

In this case, the lifting of reinforced concrete structures should be carried out only after a test lift to a height of 5-10 cm and a tight tightening of the cable on the installed pipe structural element. The installer must mark in advance the places for slinging on the pipe elements being mounted.

48. When delivering steel and reinforced concrete structures to the installation site, it is prohibited:

Unloading of pipe elements by dropping;

Moving structural elements over the driver's cabin by crane;

Unloading and moving steel and reinforced concrete structures in the event of a faulty crane sound signal, lift height limiter, load limiter or other faults specified in the Design Rules and safe operation lifting mechanisms;

Lifting structures covered with earth, frozen or embedded with other elements or loads without preliminary cleaning, as well as unspecified weight.

49. When installing reinforced concrete structures of culverts, the installer must comply with the following safety requirements:

Raise and lower structures smoothly, without jerking or hitting the installed pipe elements;

To prevent swinging and rotation of mounted structures, use braces made of hemp rope or thin cable;

When lifting, lowering and moving pipe structures, it is prohibited to direct them to the installation site directly with your hands, without the help of guy ropes;

When installing elements of reinforced concrete pipes, it is prohibited to push or pull them by hand.

50. Moving pipe structures in the horizontal direction must be done at a height of at least 0.5 m above other objects. Before installing reinforced concrete structures in the design position, they must first be lowered above the installation site by no more than 30 cm, and then the element being mounted must be directed to the installation site.

51. When installing pipe structures, the installer must not allow the structures to move above the workplaces of other workers.

52. Raised pipe elements must not be left suspended. The installer must firmly and securely fasten installed element and only after that release it from the slings.

53. The installer must know the weight of the reinforced concrete pipe elements being installed. If it is impossible to determine the weight of the elements, the installer must contact a foreman or foreman.

54. When installing reinforced concrete structures, the weight of which is close to the maximum lifting capacity of the crane for a given boom radius, the installer must first lift the structure to a height of 20-30 cm, check the stability of the crane and only then continue lifting and installing pipe structural elements.

55. If during the installation of structures the installer notices any malfunction of the crane, he must stop the installation, lower the structure and inform the crane operator and the person responsible for the safe performance of work on moving loads with cranes.

56. The erector must ensure that the hook or other gripping device of the crane is located exactly above the element of steel and reinforced concrete structures. It is prohibited to drag the mounted element with an oblique tension on the cable or by turning the crane.

57. Before each shift, the installer must inspect the lifting devices in use and report his comments on their suitability for installation to the foreman or foreman. During installation, it is prohibited to use hooks and steel ropes that have broken strands or visible wear.

58. The installer is prohibited from being inside the pipe being constructed directly below the element being mounted.

59. Mounting loops steel structures and reinforced concrete products should be facing upward, and the factory markings should be facing the passage.

Requirements after completion of work

60. Tidy up your workplace.

61. Upon completion of work, the installer must clean concrete mixture hand tools, remove foreign objects and materials from passages and driveways, stably lay parts and structural elements.

62. Remove working tools (cables, blocks, winches, jacks), lubricate them and store them in a specially designated place.

63. The installer must inform the foreman, foreman, and shift worker about all malfunctions, violation of the strength of fastenings and other shortcomings noticed during work or when accepting a shift.

Agreed:

Deputy Chairman of the Central Committee

workers' union

road transport

and road facilities

N.D.Silkin

First Deputy

general director

Federal Highway

Department of the Ministry of Transport of the Russian Federation

O.V.Skvortsov

Agreed: I approve:

Chairman of the trade union committee Head of the organization

____________________ ______________________

2002 __________2002

Protocol No.

Instruction No. on labor protection for the installer

1. General safety requirements

1.1. Persons at least 18 years of age who have passed a medical examination are allowed to work independently as an installer, as well as:

    induction training;

    fire safety instruction;

    initial training at the workplace;

    training in safe methods and techniques of work for at least a 10-hour program (for work that has increased safety requirements - a 20-hour program);

    Instruction on electrical safety in the workplace and testing of mastery of its content.

To perform the duties of an installer, persons who have no medical contraindications for this profession and who have undergone training and instructions on labor protection can be hired.

1.2. The installer must:

    repeated instructions on occupational safety in the workplace at least every three months;

    unscheduled briefing: when changing the technological process or labor safety rules, replacing or upgrading production equipment, fixtures and tools, changing working conditions and organization, violating labor safety instructions, breaks in work for more than 60 calendar days (for work to who are subject to increased safety requirements - 30 calendar days);

    dispensary medical examination according to the order of the Ministry of Health of the Russian Federation. No. 90 from 14.03 98

1.3. The installer is obliged:

    comply with the internal labor regulations established at the enterprise;

    comply with the rules for the design and safe operation of lifting mechanisms;

    comply with the requirements of this instruction, instructions on fire safety measures, instructions on electrical safety;

    comply with safety requirements when using portable power tool; equipment operation;

    Use the personal protective equipment provided for its intended purpose and take care of it.

1.4. The installer must:

    be able to provide first (pre-medical) aid to a victim in an accident;

    know the location of first aid facilities, primary fire extinguishing equipment, main and emergency exits, evacuation routes in the event of an accident or fire;

    perform only the assigned work and do not transfer it to others without the permission of the foreman or workshop manager;

    while working, be attentive, do not be distracted or distract others, do not allow persons unrelated to work to enter the workplace;

    The installer must know and observe the rules of personal hygiene. Eat, smoke, and rest only in specially designated rooms and places. Drink water only from specially designed installations.

    If you find malfunctions of equipment, devices, tools or other shortcomings or dangers in the workplace, immediately inform the foreman or workshop manager. You can begin work only with their permission after eliminating all deficiencies.

    If a fire is detected or in the event of a fire:

    turn off the equipment;

    inform the fire department and administration;

    start extinguishing the fire with the equipment available in the workshop primary means fire extinguishing in accordance with fire safety instructions.

If there is a threat to life, leave the premises.

    In the event of an accident, provide the victim with first (pre-medical) aid, immediately report the incident to the foreman or workshop manager, take measures to preserve the situation of the incident (condition of the equipment), if this does not create a danger to others.

    For failure to comply with the safety requirements set out in these instructions, the installer is liable in accordance with current legislation.

    In accordance with the “Standard Industry Standards for the free issuance of special clothing, special footwear and other personal protective equipment to workers and employees” mechanic-repairman Requires: a cotton suit - a wear period of 12 months and combined mittens - a wear period of 2 months. Those constantly busy outdoors with assembly and installation in winter additionally: cotton jacket with insulating lining - wear period 30 months; cotton trousers - wear period 30 months.

The issued personal protective equipment should be stored in the dressing room in the closet, washed and repaired in the prescribed manner.

1.11. The main dangerous and harmful production factors under certain circumstances may be:

    elements production equipment;

  • faulty working tools, fixtures and equipment;

    electric current;

    electrical equipment or wiring;

    increased air dustiness;

    increased noise level.

I CONFIRM:

________________________

[Job title]

________________________

________________________

[Name of company]

________________/[FULL NAME.]/

"____" ____________ 20__

JOB DESCRIPTION

Installer of frame-sheathing structures, 5th category

1. General Provisions

1.1. This job description defines and regulates the powers, functional and job responsibilities, rights and responsibilities of an installer of frame-sheathing structures of the 5th category [Name of the organization in the genitive case] (hereinafter referred to as the Company).

1.2. An installer of frame-sheathing structures of the 5th category is appointed to the position and dismissed from the position as established by the current labor legislation by order of the head of the Company.

1.3. An installer of frame-sheathing structures of the 5th category belongs to the category of workers and reports directly to [name of the position of the immediate supervisor in the dative case] of the Company.

1.4. An installer of frame-sheathing structures of the 5th category is responsible for:

  • timely and high-quality execution they have tasks according to their intended purpose;
  • compliance with performance and labor discipline;
  • compliance with labor safety measures, maintaining order, compliance with fire safety rules in the assigned work area (workplace).

1.5. A person with secondary vocational education in this specialty and at least 1 year of work experience is appointed to the position of installer of frame-sheathing structures of the 5th category.

1.6. In practical activities, an installer of frame-sheathing structures of the 5th category must be guided by:

  • local acts and organizational and administrative documents of the Company;
  • internal labor regulations;
  • rules of labor protection and safety, ensuring industrial sanitation and fire protection;
  • instructions, orders, decisions and instructions from the immediate supervisor;
  • this job description.

1.7. An installer of frame-sheathing structures of the 5th category must know:

  • installation procedure suspended ceilings from acoustic plasterboard sheets;
  • methods of attaching frame profiles to base ceiling;
  • methods for constructing niches, false columns, internal domes and vaults from plasterboard and gypsum fiber sheets;
  • procedure for sealing corner joints;
  • purpose and methods of manufacturing templates for complex frame-sheathing structures geometric shapes;
  • rules for cutting and manufacturing frame elements of frame-sheathing structures of complex geometric shapes and complex structures;
  • rules for selecting and assembling materials and parts in accordance with the work project.

1.8. During the period of temporary absence of an installer of frame-cladding structures of the 5th category, his duties are assigned to [deputy position title].

2. Job responsibilities

An installer of frame-sheathing structures of the 5th category performs the following labor functions:

2.1. Installation of suspended ceilings from acoustic plasterboard sheets.

2.2. Attaching frame profiles to the base ceiling using special hangers.

2.3. Construction of niches, false columns, internal domes and vaults from plasterboard and gypsum fiber sheets.

2.4. Installation of ventilated building facades using cement slabs"Aquapanel" type.

2.5. Seal corner joints, seams between facing slabs and joints with putty.

2.6. Sanding seams after puttying.

2.7. Installation of protective corner profiles.

2.8. Cutting and manufacturing elements of frame-sheathing structures of complex geometric shapes.

2.9. Cutting and manufacturing of frame elements of complex design.

2.10. Making templates individual elements frame-sheathing structures of complex geometric shapes.

2.11. Selection and assembly of materials and parts in accordance with the work project.

In case of official necessity, an installer of frame-sheathing structures of the 5th category may be involved in performing duties overtime, in the manner prescribed by law.

3. Rights

An installer of frame-sheathing structures of the 5th category has the right to:

3.1. Get acquainted with the draft decisions of the enterprise management concerning its activities.

3.2. Submit proposals for improvement of work related to the responsibilities provided for by this job description for management's consideration.

3.3. Inform your immediate supervisor about all shortcomings in the production activities of the enterprise (its structural divisions) identified during the performance of your official duties and make proposals for their elimination.

3.4. Request personally or on behalf of the immediate supervisor from heads of departments of the enterprise and specialists information and documents necessary to perform their job duties.

3.5. Involve specialists from all (individual) structural divisions of the Company in solving the tasks assigned to him (if this is provided for by the regulations on structural divisions, if not, with the permission of the head of the Company).

3.6. Require the management of the enterprise to provide assistance in the performance of their official duties and rights.

4. Responsibility and performance evaluation

4.1. The installer of frame-sheathing structures of the 5th category bears administrative, disciplinary and material (and in some cases provided for by the legislation of the Russian Federation, criminal) responsibility for:

4.1.1. Failure to comply or improper execution official instructions from the immediate supervisor.

4.1.2. Failure or improper performance of your labor functions and the tasks assigned to him.

4.1.3. Illegal use of granted official powers, as well as their use for personal purposes.

4.1.4. Inaccurate information about the status of the work assigned to him.

4.1.5. Failure to take measures to suppress identified violations of safety regulations, fire safety and other rules that pose a threat to the activities of the enterprise and its employees.

4.1.6. Failure to ensure compliance with labor discipline.

4.2. The assessment of the work of an installer of frame-sheathing structures of the 5th category is carried out:

4.2.1. By the immediate supervisor - regularly, in the course of the employee’s daily performance of his labor functions.

4.2.2. The certification commission of the enterprise - periodically, but at least once every two years, based on documented results of work for the evaluation period.

4.3. The main criterion for assessing the work of an installer of frame-sheathing structures of the 5th category is the quality, completeness and timeliness of his performance of the tasks provided for this instruction.

5. Working conditions

5.1. The work schedule of an installer of frame-sheathing structures of the 5th category is determined in accordance with the internal labor regulations established by the Company.

5.2. Due to production needs, an installer of frame-sheathing structures of the 5th category is required to go on business trips (including local ones).

I have read the instructions on __________/___________/“____” _______ 20__.

Job responsibilities installer depend on what kind of equipment he has to install. Our sample job description for an installer is suitable for regulating an installer of material handling equipment.

Installer job description
(Job description for a lifting and transport equipment installer)

I APPROVED
CEO
Last name I.O. ________________
"________"_____________ ____ G.

1. General Provisions

1.1. The installer belongs to the category of workers.
1.2. The installer is appointed to the position and dismissed from it by order of the General Director on the recommendation of the head of the structural unit.
1.3. The installer reports directly to the head of the structural unit.
1.4. A person who meets the following requirements is appointed to the position of installer: primary vocational or secondary vocational education, work experience in the relevant field for at least six months.
1.5. During the absence of the installer, his rights and obligations are transferred to another official, as announced in the organization order.
1.6. The installer must know:
- methods of installation of particularly complex equipment;
- methods of regulation and adjustment of equipment;
- rules for individual testing of equipment.
1.7. The installer is guided in his activities by:
- legislative acts of the Russian Federation;
- Charter of the organization, internal labor regulations, others regulations companies;
- orders and instructions from management;
- this job description.

2. Job responsibilities of the installer

The installer performs the following duties:
2.1. Carries out installation of metal structures of portals, bridges, towers, booms, supports and other load-bearing units of cranes.
2.2. Installs movement mechanisms for cranes operating on curved tracks.
2.3. Installs electric winches and hydraulic lifts.
2.4. Performs installation of rail grips.
2.5. Takes part in testing cranes.
2.6. Performs other work on the installation of lifting and transport equipment.

3. Installer rights

The installer has the right:
3.1. Require the administration to ensure labor protection, safety and fire safety rules.
3.2. Require the provision of protective clothing in accordance with current standards.
3.3. Submit proposals for improvement of work related to the responsibilities provided for in these instructions for consideration by management.

4. Responsibility of the installer

The installer is responsible:
4.1. For failure to perform and/or untimely, negligent performance of one’s official duties.
4.2. For non-compliance current instructions, orders and instructions for maintaining trade secrets and confidential information.
4.3. For violation of internal labor regulations, labor discipline, safety and fire safety rules.

Return

×
Join the “koon.ru” community!
In contact with:
I am already subscribed to the community “koon.ru”