Layout in an old wooden house. Registration of house redevelopment

Subscribe
Join the “koon.ru” community!
In contact with:















Houses made of wood (timber and logs), despite all their advantages, require periodic repairs - this applies to even the most durable buildings built according to all the rules. More than half wooden houses the private sector was inherited by the current owners from previous generations, and have a solid history of use. But even if the age of the house has exceeded fifty years, it is still a living space, a valuable resource.

Sentimental feelings and the situation on the real estate market do not allow such a building (often having an unpresentable appearance) to be put up for sale. And with the proceeds from the sale of an old house, it is hardly possible to build new housing without additional financial injections. Demolition of a dilapidated house and construction of a new one in its place is an option that, for various reasons, is not suitable for every family. The next logical step is to reconstruct the house.

It won't be long before there are buyers for a house like this.

When is reconstruction needed?

The need for reconstruction (full or partial) is indicated by the following signs:

  • Foundation. The base cracks or begins to collapse (and water that regularly gets into the cracks will completely destroy it in a couple of years). If the foundation sags, the caulk (seal) may fall out or the seams between the crowns begin to open up and cracks form. The porch may change position, the entrance doors begin to rub the floor, and the windows are difficult to open. All these signs indicate that the house has acquired an angle of inclination, which only major repairs can straighten.
  • Condition of the wood. Appearance wooden wall does not always indicate the magnitude of the problem. It is important to assess the condition not only upper layers logs (timber), but also their internal parts.
  • Roof. Almost always in old houses the roof is the source of problems - leaks and dampness in living areas. Rafters and floor beams rot and are damaged by fungus or insects.
  • Walls. The lower crowns often rot, and the rest of the wood becomes a breeding ground for mold and wood-boring beetles.

Lower crowns need replacement

Reconstruction: where to start

Any owner of an old wooden house wants to figure out what is more profitable - to repair an existing building or build a new one. Deciding whether they need to renovate an old house is based on several factors:

  • Finance. Although building a new home is more expensive than a refurbishment operation, major renovations will also require a hefty amount of money.
  • Time. It is important to understand by what time all work must be completed (before the start of autumn rains)
  • Technical condition of the house. Important parameter, defining the previous points. It is necessary to involve a professional for analysis.

A competent specialist will determine not only the deterioration of the building (which the owners can also do); he will find out:

The rafter system has fallen into disrepair

A professional builder will help you estimate the scope of work; whether the reconstruction will be complete, partial or pointless (when it is worth thinking about building new housing). In any case, the final decision is made taking into account his opinion.

Preparing for reconstruction: problem areas

When inspecting the house, you may find the need to:

  • replace the foundation (partially or completely) or strengthen it (eliminate cracks, strengthen the basement);
  • replace defective logs (beams) of the bottom row (bottom crown);
  • replace wall fragments;
  • restore the roof with replacement of rafters and roofing;
  • partially repair or completely re-lay the floor;
  • partially or completely replace communications (pipes, electrical wiring);
  • install a drainage system;
  • replace windows and doors.

Longitudinal cracks in the wall of an old house

Typically, during reconstruction:

  • wooden elements of the house are impregnated protective compounds(antiseptic and fire retardant);
  • walls are insulated (with inside), floor, roof;
  • are being restored outside surface walls (sanded, primed, impregnated with antiseptic and covered with varnish or paint).
It is important! Very often, during reconstruction work, unexpected problems arise. For example, when replacing a floor, rotten pipes are discovered; when replacing a roof, a lack of insulation is found. No one can foresee this until the final cladding is removed, so you need to be prepared for unforeseen expenses.

Reconstruction: stages

Many owners of old wooden houses have no idea how to change their home. , engaged in repairs and reconstruction, have accumulated extensive experience working with the most dilapidated and neglected buildings. When the reconstruction of a village house is discussed, the project changes its outline more than once.

Project to expand the area of ​​the house (organization of an extension)

In any development of events, the restoration of the house goes through several stages:

On our website you can find contacts of construction companies that offer the service of reconstruction and rebuilding of houses. You can communicate directly with representatives by visiting the “Low-Rise Country” exhibition of houses.

Project and budget, procurement of materials and preparatory work

When assessing the condition of a home, specialists conduct necessary measurements. Afterwards, design documentation is drawn up, which presents:

  • condition and defects of structural elements;
  • work plan (calculations and estimates);
  • terms of work;
  • 3D model of a house ( visual way see the change in the facade, internal redevelopment and style of finishing work).

When reconstructing a house with an increase in area, the wishes of the owners are a priority

When preparing technical specifications, the opinion of the owners is taken into account. Home owners can decide:

  • increase the area of ​​the house or carry out redevelopment;
  • build an extension (for a garage, veranda) or terrace;
  • arrange the attic;
  • equip WC, install water or sewerage;
  • add comfort and install a stove or fireplace;
  • conduct decorative cladding facade (siding, lining, imitation timber, block house);
  • additionally insulate the house;
  • carry out landscape design of the yard.

The company prepares permits for relevant organizations and provides home owners with a detailed budget, including:

  • selection of materials and calculation of their quantity and cost (determined by measurements);
  • transportation costs;
  • price repair work;
  • possibility of unforeseen expenses.

For significant completion, material is purchased with a reserve

Materials are purchased in volumes that are 5-10% greater than the calculated volume. During preparatory work dismantle building elements that require alteration or replacement (roof, walls and internal partitions).

Foundation

Reconstruction of an old wooden house begins from the foundation. The foundation is one of the most common problems old buildings, since at one time it was done as economically and with technological violations(under the weight of the structure, such a structure sinks deep into the ground). Most often, under wooden houses with “experience”, a strip or columnar foundation, often located above the freezing level. To assess the scope of work, they examine the outer part of the foundation, and, if necessary, dig out the buried part. Sometimes there is no foundation, and the plinth is laid on the ground

The strip foundation is reinforced or a new foundation is poured. To do this, you need to lift the box with jacks, dismantling the floor and cladding. For a columnar foundation, the best solution would be to install additional piles that can redistribute the weight of the structure.

The frame of the house is lifted to gain access to the foundation

Crowns and walls

Half a century ago, when building houses, few people thought about compliance building regulations and arranged reliable waterproofing between the foundation and walls. The lower crowns of wooden dwellings easily became saturated with moisture, rotted and gradually became unusable.

Replacement of the crowns is carried out simultaneously with the reconstruction of the foundation, when hanging the box. Logs or beams prepared for replacement are treated with an antiseptic; Waterproofing is installed between the new crowns and the base. When restoring walls, the elements most often in need of replacement are those located around the windows. Also, the upper crowns often suffer from moisture penetrating through the roof and accumulating in the insulation.

Video description

About the partial replacement of the foundation in the following video:

Roof

Roof repair work can be done in two ways:

  • Roof reconstruction. A complete remodel is carried out if the owners want to increase the area of ​​the house by planning an extension or an insulated attic.
  • Revision. Elements are inspected roofing system, destroyed (with traces of rot) are replaced. Most often, the place of leakage is the chimney.

The old slate is replaced with a suitable modern material (which is mainly determined by its weight), and the attic is thermally and waterproofed.

Exterior wall sanding

Exterior decoration

Owners of a wooden house can go in two ways:

  • Restoration of wall surfaces. To highlight the natural beauty of wood, modern facing materials are not used. The walls are tidied up using a brush or grinder with a special attachment. The surface, cleaned of dirt and long-term deposits, is impregnated with an antiseptic and fire retardant. Using varnish or paint will reveal the structure of the wood, even out the shades of old and new fragments and additionally protect the surface.
  • Finishing work. Finishing wooden facade(often with insulation) serves additional protection walls, helps retain heat and at the same time transforms the house beyond recognition. Popular finishing materials include siding, plaster, block house, and PVC panels. The walls can be lined with brick, clinker panels, and porcelain tiles.

Cladding a wooden house with clinker panels

Floor, windows and doors, ceiling

Paul in wooden house(especially if it is built directly on the ground) is a very vulnerable structure. Depending on the condition, the following is carried out:

  • Repair. If the boards and joists are in satisfactory condition (less than 30% damaged), replace the damaged parts of the flooring and carry out hydro- and thermal insulation.
  • Replacement. The old wooden flooring is dismantled (if the foundation has been repaired, the floor has already been dismantled) and the joists are replaced. Then they lay waterproofing film, a layer of thermal insulation (for example, basalt wool); the logs cover vapor barrier film. A board is laid on top. Sometimes a cement screed is made under the finished floor.

Window and door systems that have become unusable are replaced with new ones; they can be wooden or metal-plastic. Ceiling repair is a necessity if the beams are deformed; Usually new wooden floors are installed.

Video description

About the reconstruction of a wooden house in the following video:

Engineering systems and interior decoration

In old wooden houses, most systems need modernization. Specialists should be invited to replace or install communications (water, gas, sewer, ventilation). Experienced craftsmen will make competent electrical wiring (designed for modern loads and safe) and install an economical heating system.

At the final stage, the kitchen and bathroom are equipped; The final finishing is carried out, on which the style of the interior will depend.

Electrical wiring requires a professional approach

Reconstruction: price issue

Even an old house worn out physically and morally, no longer suitable for the owners, they are in no hurry to demolish it. Modern technologies, offered construction companies, will help breathe a second life into your favorite home, with which many memories are associated.

Many owners of old wooden buildings are afraid of everyday inconveniences, the length of work and incalculable material costs. This happens if the reconstruction of a village house is done with your own hands - the process can drag on for years. By ordering reconstruction and rebuilding from professionals, owners save time, money and nerves.

Having many years of experience in repairing wooden houses, specialists will offer several reconstruction options, and then rebuild and improve the house, turning it into a beautiful and comfortable home. The exact price of reconstruction is determined at the design stage and depends on:

  • condition of the building;
  • the need for certain types of work and their volume;
  • prices of materials and cost of work;
  • season.

Repair of an old wooden house with reconstruction will allow the owners to stay comfortably

Prices for some services and work (Moscow region):

  • Visit to assess the property(includes consultation and measurements) - from 4 thousand rubles.
  • Dismantling the old foundation- from 2 thousand rubles. per rm (linear meter).
  • Pouring a new foundation- from 8 thousand rubles. per PM (work and materials).
  • Foundation reconstruction- from 10 thousand rubles. per pm
  • Exterior finishing foundation(plaster, cladding) - from 1.6-1.8 thousand rubles. per PM (together with materials).
  • Installation of utilities- from 3.5 thousand rubles. per m 2.

The cost of the material is included in the following types works:

  • Increasing living space at home - from 5.3-5.5 thousand rubles. per m 2.
  • Veranda extension- 2.7-3 thousand rubles. per m 2
  • Roof reconstruction- from 6.4-6.8 thousand rubles. per m 2.
  • Chimney installation- from 6.5-6.7 thousand rubles.
  • Exterior decoration of the house- from 4 thousand rubles. per m 2.
  • Interior decoration Houses- from 9.2-9.5 thousand rubles. per m 2.

Video description

About turning an old house into a new one in the following video:

Ordering in a construction campaign is beneficial for many reasons:

  • The owners receive a comprehensive solution to several problems.
  • Reconstruction is carried out by performers highly qualified, using proven technology.
  • Owners are provided with a plan (with deadlines) and a budget.
  • For all construction works and materials are guaranteed (for 3-5 years).
  • Many companies provide the opportunity to pay in stages.

Two lives of one house

Conclusion

After 30-40 years of operation, any wooden house requires, if not reconstruction, then thorough repairs. Even if the owners old building it seems like there will be demolition optimal solution problems, advice from a person with great practical experience will be useful. In fact, it may turn out that there is strong wood under the sloppy and dark top layer, and the reconstruction will take much less time and money than building a new house.

Ecology of consumption. Estate: B summer time many people are thinking about buying country house, where you can come on weekends to take a break from the bustle of the city, enjoy the singing of birds and the rustling of leaves.

In the summer, many people think about buying a country house, where they can come on weekends to take a break from the bustle of the city, enjoy the singing of birds and the rustling of leaves. What to choose – a house in a holiday village or in a village?

Having decided to buy their own mini-resort, asphalt children with no experience of country life, as a rule, are inclined to buy a house in a dacha cooperative, not suspecting that the reasonable price hides the almost complete absence of infrastructure - shops, post office, pharmacy and relatively small area plot.

A much more optimal solution for those who dream of real estate far from large settlements, may be the purchase of an old village house. This is exactly what the heroes of our story did today - young married couple, which purchased an abandoned building in a village in eastern Poland and worked with designers from Ynox studio to transform it into a stylish, modern home.

Looking at this building before renovation, it is difficult to imagine that very soon it will turn into an oasis of relaxation and tranquility. It is clear that the house is in poor condition. It seems that he cannot withstand even strong winds.

This photo is the best confirmation of what talented architects and interior designers are capable of. As a result of the reconstruction of the exterior, which took only a few months, the frame of the building was strengthened, the façade was painted on all sides in a dark chestnut color, which perfectly matches the graphite tiles that decorated the updated roof, and the dilapidated windows were replaced with new ones.

Wooden houses have a huge number of advantages. First of all, wood is a highly environmentally friendly material that allows oxygen to pass through, so wooden buildings breathe easily and sleep soundly. Thanks to low thermal conductivity, you can save on heating costs, and even in the harshest winters you will not be in danger of freezing in a wooden house. However, such houses also have their drawbacks, the main one of which is the weak resistance of wood to the effects of sun, rain and snow, as a result of which wooden houses fail much faster than buildings made of brick or concrete.

After a major renovation, a wonderful terrace appeared at the entrance to the house, allowing you to enjoy the beauty surrounding nature, relax with a cup of coffee, and in the summer, have breakfast in the fresh air.

The best days of this house are in the distant past. Flooring and the surface of the walls urgently required a quick replacement. Old, time-worn furniture had a depressing effect on the new owners and was immediately sent to a landfill.

This is what the kitchen looks like after the renovation. Modern furniture, multi-colored textiles, a bouquet of flowers and paintings on the walls completely changed appearance premises, creating in it great mood, conducive to spending as much time as possible with the family in this cozy kitchen.

The fashion for rustic interiors appeared several years ago and has firmly established itself in the world of design. At the request of the owners, the rooms of the house were decorated in this style. A little rough, but very cozy furniture, hammocks made of colored fabric, the floor, walls and ceiling are lined with boards. This interior is perfect for those who live for today, but do not deny themselves the pleasure from time to time to plunge into a slight nostalgia for a carefree childhood spent in the village.

Almost all home buyers in the village are faced with the need to completely renovate their bathroom. This house was no exception. It took a lot of time and effort to turn this room into a modern bathroom. The result of the designers' work exceeded all expectations.

The new owners of the house prefer warm and cozy wood to all other materials. In this bathroom, as in all other rooms of the house, the floors and walls are made of light wood. In contrast are modern washing machine and a large shower with tray. published

Join us on

By purchasing a private house, everyone strives to bring not only comfort into the environment, but also to shape the space so that it can be used most comfortably. Sometimes it is required, but not everyone knows that such actions cannot be performed without permission. To make changes to the building plan, permission from the administration is required, otherwise your actions will be illegal.

We will tell you how to legalize the redevelopment of a private house and register it in our article. Even if changes have already been made to your home, it is never too late to formalize everything according to the law, otherwise you may face the need to restore the previous appearance of the house and a fine for unauthorized actions.

Many people wonder why such actions need to be formalized at all, since the person is the owner and can independently make decisions regarding his property? The thing is that not all operations of this nature are safe. It is possible that During dismantling, supporting structures may be damaged, which can be dangerous.

Read what the consequences of illegal redevelopment are.

Without registering the redevelopment in accordance with the law, you risk encountering problems when selling real estate, since all actions of this kind must be registered in the cadastral documents of the structure. The technical passport of the object must be updated upon sale, which obliges the owner to invite an inspector who, having identified a discrepancy with the plan, can impose a fine on the owner and force him to restore everything according to the plan in court.

Attention!

Therefore, the most the right decision will register the changes and make them legally. The cost of registration will be 2,500 rubles, and the period within which the permit will be ready will be 2 months.

What actions need to be recorded?

Regarding a private house, the following series of actions are considered redevelopment:

  • Laying gas, water and electricity supply systems, and changing their location;
  • Re-equipment and creation of additional bathrooms and bathrooms;
  • Installation of showers, Jacuzzis and other plumbing fixtures, as well as equipment technical premises, involving greater water and electricity consumption;
  • Re-equipment of ventilation and installation of additional ventilation equipment;
  • Creating doorways;
  • Construction of additional residential premises and extensions;
  • Moving and dismantling partitions.

This set of actions needs permission to prevent actions from being performed that fall into another list containing a series of actions for which you will not receive permission. The law prohibits the following work:

  • Repair and refurbishment of premises that can worsen the living conditions of your neighbors or cohabitants;
  • Installation heating devices on balconies and loggias;
  • Installation of balconies above the second floor, if this was not intended by the original design;
  • Carrying out work in an emergency building;
  • Increased load on the load-bearing walls of the house;
  • Creation of an internal additional room without windows and heating systems;
  • Interfering with the room ventilation system;
  • Dismantling load-bearing walls, weakening the strength of the structure.

Information!

If your desire to refurbish your home is not on this list, do not rush into action. First, you should prepare the documents and, after receiving permission, carry out the redevelopment of a private house.

Read about the cost of remodeling an apartment.

Legislative regulation

The main laws that regulate the redevelopment of a private house are:

  • Articles 25 to 29 of the Housing Code of the Russian Federation, where legal and illegal actions for redevelopment and reconstruction of the interior of the house are regulated;
  • Government Decree No. 266 of the Russian Federation contains the document form and application for redevelopment and regulates the coordination of work with administrative authorities;
  • Article 7.12 of the Code of Administrative Offenses dictates the responsibility of the owner who decided to carry out redevelopment without permission from the authorities.
  • Moreover, at the regional level Additional legislation may apply regulating such actions in residential premises.

Types of jobs

Depending on how large-scale actions you have planned, There are several types of work on redevelopment of a private house:

  • Indigenous, which implies both internal redevelopment of the house and facade work. These include changing the number of storeys of a building, constructing an extension or attic, and rebuilding the foundation. To carry out such work you will need to submit individual project, since standard design does not imply such redevelopment in the house;
  • Internal redevelopment involves re-equipping the premises according to the personal needs of the owner. If you are absolutely sure that your actions are legal, then you can start them immediately and get permission later. To record changes in the building plan, a BTI employee is called to the house. It records all changes and compiles new plan buildings, on the basis of which changes are made to the technical passport of the facility.
  • External redevelopment involves updating the facade, changing window openings, moving front door, refurbishment of the roof with a new roof. For finishing the facade with insulation or other modern materials, the consent of the authorities today is required only if the building is classified as a cultural monument of architecture;
  • Restoration work involves restoring the appearance of the building, rebuilding worn-out and damaged parts of the structure. Such work requires permission from the BTI.

Information!

Depending on the type of your private home, it may different actions. So, for example, if the building is frame, then you can turn almost any of your ideas into reality. In situations with brick houses things are somewhat more complicated, since some walls are parts of load-bearing structures.

Read about redevelopment in a mortgaged apartment.

How to apply?

If you are planning a large-scale redevelopment, then the approach to it will be quite serious and will include several mandatory stages, the observance of which will allow you to do everything competently and according to the law. The main one can be considered a study of the technical condition of the house, within the framework of which a study of the building will be carried out in order to identify weak points structures and the possibility of redevelopment work.

Read how to get neighbors' consent for redevelopment.

Then, based on the research, the owner draws conclusions about how feasible it is to carry out the work he has planned. It is required to prepare a sketch, and in some cases a project of the upcoming work. Design will be required in the following cases:

  • If you have to make a change to the load-bearing walls;
  • If it is intended to build or modify existing stairs, loggias and balconies;
  • When moving and creating new bathrooms;
  • When installing additional partitions;
  • When glazing loggias and balconies;
  • When making changes to architectural view building.

Warning

The project must be compiled by a licensed design organization, with which the owner must enter into an agreement. In all of the above cases, you will be required to submit redevelopment.

Having the following series of documents in hand, You can submit them to the district administration:

  • Application for redevelopment;
  • Consent of cohabitants and neighbors if the redevelopment affects them;
  • Passport and building plan from BTI;
  • Copies of documents confirming ownership;
  • An extract from the house register, where everyone living in the house is noted;
  • Sketch or redevelopment project;
  • Agreement with projectors;
  • Conclusion on the technical condition of the building.

After a while, the administration will issue you a permit with a list of actions that you can perform in your home, after which you can begin work.

Information!

After carrying out the work, you should contact the BTI to take measurements and make changes to the documentation. After which the owner will receive a certificate, which must be submitted to the district administration. Based on this request, BTI will make changes to the technical documentation and within a month will issue you a new one cadastral passport object. Then, with the received documents, the owner must appear at the Service Department state registration cadastre and cartography. Here, all changes will be finally registered and a new certificate of ownership will be presented to you. The longest of all stages is obtaining permission for redevelopment; otherwise, the procedure should not take much time.

What if the work has already been done?

If you have already made changes, the outcome of the situation may be different, depending on how serious the work was carried out. You should follow this procedure:

  1. Write an application for redevelopment;
  2. Receive a technical opinion;
  3. Obtain the consent of residents and neighbors;
  4. Obtain an extract from the house register;
  5. Submit all collected documents to the district administration;
  6. After receiving permission, go to the BTI to obtain a new technical documentation;
  7. An inspection must be carried out confirming that all actions were carried out according to the rules;
  8. A conclusion from the Sanitary and Epidemiological Service will be required on the premises’ compliance with standards;
  9. You will also need to draw up a project if the changes made require it;
  10. Only after submitting all documents to all involved organizations can the redevelopment be considered legal; most likely, you will have to pay a fine.

Redevelopment in a private house can be carried out due to many circumstances. This could be a change in the actual owner or the birth of a child, for whom a special room must be equipped that was not provided for in the original layout.

The process of rebuilding private houses has its own characteristics. For example, this procedure does not in any way affect the interests of persons living in the apartment, unlike those situations when redevelopment is carried out in an apartment. It is worth noting that any complex repair and construction work must be carried out in any case.

Dear readers! The article talks about typical ways to resolve legal issues, but each case is individual. If you want to know how solve exactly your problem- contact a consultant:

APPLICATIONS AND CALLS ARE ACCEPTED 24/7 and 7 days a week.

It's fast and FOR FREE!

New premises that appear as a result must be heated in mandatory. This problem becomes especially relevant in cases where the house does not have a central heating system. Redevelopment can only be carried out by competent persons or organizations, however, in some cases an independent procedure may be provided.

General details of the idea

Reconstruction of a private house may involve the following operations:

  • replacement of windows and doors;
  • partial or complete roof replacement;
  • strengthening the façade of a building or installing thermal insulation systems;
  • replacement of electrically conductive structures indoors;
  • arrangement of attics, etc.

All work must be carried out in strict accordance with pre-prepared design documentation, which takes into account all possible changes. It is important to take into account the characteristics of floor slabs. Rearranging them can cause the entire structure of the house to collapse.

To carry out redevelopment, the interested person must submit an application drawn up in in writing, to regulatory authorities. This paper must be supported by certain accompanying documentation, which includes all technical plans for each room.

The corresponding reconstruction project is drawn up by specialists, taking into account the features of the design, reconstruction, finished 3D sketch and all previously taken measurements

How to get permission

Coordination of procedural aspects of redevelopment for a private house is practically no different from the corresponding process for multi-apartment buildings. The specifics of the implementation of the corresponding procedure are regulated by the provisions of the current one.

It is worth noting that the process may be a little more complicated if the building belongs to the list of cultural or historical heritage sites. In this case, interested parties will have to visit several authorities, including the territorial department responsible for the protection of architectural monuments.

To carry out redevelopment, the owner of the house must submit a special application to the authorities local government so that authorized employees can issue special permission to begin the reconstruction. The review period for submitted documentation may take up to 30 days.

Before the actual start of repair and construction work, a special organization must draw up design documentation in accordance with which the house will be reconstructed. The draft must necessarily reflect all possible changes.

What affects the redevelopment of a private house

Collection of documents

To begin the reconstruction, preliminary approval of the process with regulatory authorities is necessary.

To do this, it is important to prepare the following documents:

  • a certificate confirming the fact that the person interested in remodeling the house has the legal right to use a specific premises;
  • extract from the house register;
  • certificate from the territorial office of the BTI;
  • if an extension to the house is planned, then it is necessary to provide special permission obtained from representatives of the management company;
  • official consent of all neighbors for the construction of additional parts of the house - the document must be executed in writing;
  • act of agreeing on the procedure with the municipal inspection;
  • special sanitary permit;
  • documented expert review the fact that the house complies with all existing building codes;
  • photos of each interior space and external parts of the house.

It is worth noting that in some cases, regulatory organizations may request the provision of a certificate confirming where the building is located.

mandatory conditions legitimizing changes in the design of any premises, carried out with the aim of bringing them into compliance with existing building codes.

You can find out how you can coordinate redevelopment yourself in Moscow from.

Creating a Project

Many citizens interested in rebuilding their private home are interested in the question of whether it is necessary to in this case generate project documentation. The availability of the project is regulated by current housing legislation.

This document is required for the following situations:

  • when changes will directly affect the supporting structures of the house;
  • when installing new stairs or bathroom equipment;
  • in the case of any changes that cause increased pressure on the floors - this is especially true when an old house is being renovated;
  • when installing external glazing;
  • in case of transformation of the facade of a building.

It is worth noting that if the redevelopment involves only changes that do not directly affect the supporting structures, then the appropriate permit can be issued based on the provision of a sketch. The preparation of design documentation can only be carried out by special organizations holders of an SRO certificate.

The cost of manufacturing the project is determined depending on tariff schedule the organization itself. The total price depends on the complexity of the proposed changes.

Changes inside

Changes inside the house may include rearranging living spaces, dividing rooms, creating new doors and window openings, as well as moving the kitchen and bathroom to a new location. These operations can be carried out by the interested party with his own hands, however, in this case, increased care is required.

To create a passage room, you will need to first dismantle the partition and break through new window openings. In cases where the corresponding partition is an element load-bearing structure, installation required steel beam, onto which the main load will be distributed. As for new doors or window openings, special lintels will be installed above them.

To divide one of the rooms into two, it is planned to install a new partition with the addition of doors. In the vast majority of cases new wall created from plasterboard with a wooden frame.

Volume interior works may depend on the overall magnitude of the changes being made. Additional work may be required on walls and floors, plumbing or sewer system, as well as changes in electrical equipment.

Legalize through court

Quite often there are situations when redevelopment in a private house has already been carried out previously, but without prior acceptance of the design documentation. In this situation, the only logical solution may be the implementation of a new project.

An independent redevelopment procedure can be legalized in 2019 in the highest courts at the actual location of the object real estate. This civil right is regulated by the provisions of Article 29 of the current Housing Code.

It is worth noting. that independent legitimation can be carried out only in cases where the interests of citizens living in the house and in neighboring houses were not violated during the process of reconstruction. Also, precedents should not be created that threaten the health and life of these individuals.

If all rules are followed, the decision of the highest courts will become the legal basis for redevelopment. To initiate the process, interested citizens must provide the court with technical passports before and after the reconstruction, as well as a special conclusion of the expert commission on the actual condition of the load-bearing elements.

If on your own

If the redevelopment of the house was carried out without permission and without prior approval from government inspectors, then mandatory execution is important established order legitimizing the procedure. To get everyone necessary documents the interested party must act as competently as possible on the property with the changes made. Legalization of the procedure can only be carried out through the court.

To succeed in this matter, it is important to follow a certain algorithm of actions, which consists of the following stages:

  • personal application to the housing department of the local municipality with a statement containing information about the fact independent implementation reconstruction;
  • Preparation statement of claim to higher judicial authorities in order to obtain appropriate permission;
  • registration of technical documentation in the territorial office - these papers must clearly indicate the layout of the premises;
  • registration of new cadastral documentation for real estate;
  • submission of completed documentation to the Rosreestvo branch to make appropriate changes to the unified State Register real estate;
  • obtaining an updated certificate confirming .

In the process of preparing an application and accompanying documentation for subsequent submission to the court, you need to understand the fact that, in any case, for violations of the current housing legislation that may be discovered during the proceedings, the owner of the house will need to pay a certain fine (in some cases the amount of sanctions can reach up to 25 minimum wages)

How much does it cost

To understand how much it costs to redevelop a private property, you need to look at the price of each procedural point separately.

Current information is presented in the table below:

Procedure An object Cost (in rubles)
Sketch approval A private house Before 20 000
Coordination of internal redevelopment features Before 60 000
Coordination of the process affecting load-bearing elements Before 65 000
Reconstruction Glazing the facade or creating new doorways Before 105 000
Combining rooms A private house Before 100 000
Creating a redevelopment project Before 30 000
Floor design Floors Before 8 000
Design of openings in the ceiling Doors Before 60 000
Inspection of load-bearing elements A private house From 30 000

Fines for violations

The list for repair and construction work carried out without prior approval from the regulatory authorities is as follows:

Type of violation Amount of fine (in rubles)
Extension of additional premises Before 4 400
Creating a door or window opening in load-bearing structures
Moving the kitchen to a new location Before 4 000
Violation of the general configuration of the house Before 5 200
Demolition of the supporting structure and installation of a new one Before 1 500
Unauthorized installation of gas equipment Before 1 300
Absence of some parts of the house in the technical documentation Before 10 000
Non-compliance of the residential premises with existing documentation Before 1 100
Transfer of gas stoves Before 500

Building a new country house is a rather lengthy and complex process that requires significant financial costs. That is why the reconstruction of an old wooden house still remains a relevant and budget alternative. It is advisable to entrust the work to the team professional specialists who will be able to restore the aesthetics of the house efficiently and as quickly as possible.

If for certain reasons this is not possible, then you can try to do everything yourself. But to do this, you should study the relevant literature on the Internet and read our article. This will allow you to understand the principle of performing the work and get the desired result.

Reconstruction of a wooden house cannot be carried out as often as major and planned repairs. But the costs of this work will be significant, so it’s worth trying to extend the life of your home through timely repairs.

How to understand that reconstruction is required

The first signs of the need to reconstruct a house may be the presence of deformations of the frame, depressions and bulges. In addition, the walls begin to noticeably let in much more moisture and the condition of the roof becomes more dilapidated.

It is quite possible that cracks, destruction of the base and gaps between the logs will appear. Having noticed such changes, it is important to immediately begin major renovation. Otherwise, you risk your life.

To determine the condition of the house it will be enough regular sewing, knife and hammer. With these tools you can easily determine the presence of defects in upper layers logs, and also evaluate the condition of their interior. But before you begin the reconstruction itself, you should definitely complete the design work.

Initial stages of reconstruction of a wooden house

Now the reconstruction of a wooden house is carried out in several successive stages, the importance of each of which should never be forgotten. First of all, work is carried out to restore the external part of the house. At this stage, it is possible to redevelop the premises, as well as increase the building area.

The old paint layer is being removed and finished with modern materials. High Quality. Siding is often used for these purposes. It is also possible to dismantle some walls, which is necessary to expand some rooms, if these changes are suggested by the plan.


Reconstruction of the house. Extension of new premises

Development of a sketch of the house is required regardless of the degree of its damage. Entrust this work to professional architects who can change your home beyond recognition. They will take into account all your wishes and preferences. The sketch is important at every stage of reconstruction: choosing materials for finishing and construction, drawing up estimates, and also performing the work.

On next stage The roof, walls and foundation of the house are being reconstructed. The comfort and functionality of a wooden house in the future will depend on the quality of work that was performed at this stage.

It is always worth starting the reconstruction with the conversion of the attic. Depending on its size, you will need to insulate the walls of the house or equip the attic space as a separate room. The main thing is to ensure the reliability of the floor by using logs made of timber.

Also, do not forget that the attic must have excellent thermal insulation, especially for the roof slopes. After the renovation, they will serve as the walls of the attic. Mineral wool- the best option for this purpose, although if you have a sufficient budget, you should still give preference to more modern options roll type.

Foundation destruction can occur for various reasons. The process of its reconstruction can be carried out in several ways, which differ from each other by the possibility of achieving a monolithic foundation as a result of the work:

  • replacement is carried out gradually. Old areas are replaced with new concrete blocks separate sections. This method quite simple, but oh monolithic foundation you can forget;
  • the foundation is completely replaced, and during the work the undisassembled house is placed on a temporary foundation.

Preparing the base for a new foundation

The main stages of reconstruction of a country house

Replacing old communications is rightfully considered one of the most important stages reconstruction of a wooden house. The comfort of living in the house, as well as its service life, will depend on the quality of its implementation. It is important to check all communications and replace most of them, because they were installed quite a long time ago and it is quite possible that they will begin to fail very soon.

After this stage, the power supply system is replaced. In most older homes, these systems require complete replacement with more modern ones, since they are no longer considered effective. Pick up best option You can after you finally decide on your budget and wishes.

Remember that you should not save on purchasing an energy-saving system! It is best to give preference to innovative options in which it really makes sense to invest your cash. It is worthwhile to completely replace them even in those houses where the energy saving systems appear to be in excellent condition. This will prevent unpleasant surprises in the future.

If you want to give a more complete look to your wooden house, then you can install a stove or fireplace. Thanks to him, the atmosphere in the house will be warmer and more pleasant. Just imagine how pleasant it will be to sit by the fireplace on cold winter evenings! For those who have a large budget, you should pay attention to brick stoves. They will become a real decoration of your home.


Fireplace in a wooden house

The last stage of the reconstruction involves cleaning construction waste. Great option It may be possible to cooperate with a specialized company, whose employees can easily remove all the garbage. The price of services from such companies remains affordable, so you should not spare money. Even self-cleaning requires contacting specialists for truck so that they take the garbage out of your yard.

These are all the stages of reconstruction of an old wooden house. Of course, each of them has its own nuances, which only an experienced specialist can know. Therefore, it is advisable to invite a team of professionals rather than waste your time on repairs. In any case, you will have to turn to an architect for help, because without finished project It is simply impossible to begin reconstruction of the house.

Video

Return

×
Join the “koon.ru” community!
In contact with:
I am already subscribed to the community “koon.ru”