Download the rules for the technical operation of hotels and their equipment. Cleaning materials, equipment, equipment Rules for the technical operation of hotels and their equipment

Subscribe
Join the “koon.ru” community!
In contact with:

Safe work for hotel workers

A modern hotel is a complex business. It is equipped with a large number of different equipment and property, has dozens of technical services, departments and divisions. It employs a significant number of service personnel with a round-the-clock work cycle and a continuous change of residents. All these factors require strict compliance with labor safety rules and regulations.

Labor protection requirements contained in the Intersectoral Rules for Labor Protection when Providing hotel services(hereinafter referred to as the Rules) aimed at ensuring healthy and safe conditions labor of operating hotels and apply to all employers, regardless of their organizational, legal forms and forms of ownership.

Persons guilty of violating the requirements of these Rules will be held accountable in accordance with the law.

Occupational safety and health management in a hotel is carried out by its head; in the structural divisions of the hotel - by the heads of structural divisions.

In order to prevent industrial injuries and occupational diseases, improve conditions and labor protection of workers in hotels, we are developing and implementing occupational safety action plans.

Periodic monitoring of compliance with labor protection legislation in hotels is carried out: daily, monthly and quarterly.

For the safety of hotel workers, residents and visitors:

· building structures, utility networks of hotel buildings and structures must be operated in accordance with the requirements of technical regulatory legal acts;


· technical operation of buildings must be carried out in accordance with design, operational and other documentation drawn up in in the prescribed manner;

· in progress technical operation hotel buildings must comply with the requirements of the TCP “Technical operation of residential and public buildings and structures. Procedure" (TCP 45-1.04-14-2, approved by order of the Ministry of Architecture and Construction of the Republic of Belarus dated 01.01.01 No. 000;

· During operation, re-equipment and redevelopment of hotel buildings (premises) are not allowed, leading to damage to strength or destruction load-bearing structures buildings, violation fire safety standards and rules, violations in the operation of engineering systems and (or) equipment installed in them, deterioration in the safety and appearance of facades;

· control over the technical condition of the hotel building is carried out by the employer through planned and unplanned(extraordinary) technical inspections(hereinafter referred to as inspections).

Scheduled inspections are divided into are common And partial. General examinations are carried out 2 times a year (spring and autumn). Unscheduled inspections should be carried out after natural disasters, accidents and when unacceptable deformations of the foundations are identified. Based on the results of the inspection, a report is drawn up, which is signed by all members of the commission and approved by the employer or his authorized person.

Operation of various systems

Every year, hotels should carry out activities related to preparation for operation in the autumn-winter period internal systems heat supply, heating, ventilation, air conditioning systems. All of them must be prepared in accordance with the requirements of technical regulatory legal acts for their design.

The heating system of hotel buildings must be operated in compliance with the following requirements:

– instrumentation, control and shut-off valves must be in good condition;

– the thermal insulation of pipelines in the premises must be intact.

Heating, ventilation, and air conditioning systems must be serviced by workers who have the appropriate profession and have undergone training in the prescribed manner safe methods and work methods (hereinafter referred to as service personnel).

Maintenance personnel must monitor the operation of heating systems (within heating season), ventilation and air conditioning, timely troubleshooting. Detected malfunctions must be recorded in the appropriate journal, followed by the date of their elimination, the type of work performed and the names of those working to eliminate the malfunctions (carry out repairs).

Personnel servicing ventilation systems must:

- V deadlines check the condition of air ducts, air intake and air outlet devices;

- make sure that they are not clogged and mechanical damage;

– clean dirty air ducts only when the fan is stopped;

– check the integrity of the anti-corrosion coating of air ducts.

Garbage chutes in hotels are located in stairwells or in separate rooms. Garbage chutes are not permitted in workers' rest areas.

The doors (inspections) at the top of the garbage chutes must be locked to prevent them from opening when the garbage catches fire.

Loading valves and the areas in which they are located must be kept clean.

When operating waste disposal systems, you must:

– monitor the integrity and tightness of closing the garbage chute lids;

– regularly lubricate the moving parts of waste collection valves.

Disposal of debris into the loading valve should be done in small portions. Large pieces of debris must be crushed to allow free passage through the loading valve. Before throwing into the garbage chute, small and dusty garbage should be wrapped in small bags that fit freely in the loading bucket.

In the event of blockages or malfunctions of the garbage chute, you must immediately notify the dispatcher, the person responsible for operating the waste disposal systems, or an official and temporarily stop using the garbage chute until the malfunction is eliminated.

Removal of loading valves and their repair should only be carried out by persons responsible for the operation of waste disposal systems.

Cleaning of the garbage chute barrel should be carried out by inspecting the upper part of the barrel by lowering a special weight on a cable, as well as through the openings of the loading valves when removing their moving parts.

To protect workers from injury from falling heavy objects, the gate at the bottom of the shaft should be closed while changing garbage bins and emptying the hopper.

When the collection container is filled, it should be covered with a curtain (cover).

Removal of waste bins manually must be carried out by two workers.

Dust removal in hotels should be carried out using vacuum cleaners or special centralized system dust removal, as well as manual wet and dry cleaning.

Regardless of the presence and nature of cleaning mechanisms, cleaning equipment must provide the necessary convenience for workers involved in hotel cleaning. When cleaning, you should use self-closing scoops, small portable containers, lightweight carts, etc.

Maintenance of centralized vacuum dust removal systems (hereinafter referred to as CVP) must be carried out by persons who have the appropriate profession (position), who have been duly trained in safe methods and techniques of work, who know the mechanical and electrical parts of the system and remote control of its operation.

Due to the fine dispersion of dust, it should not be allowed to fly away or spill onto the floor surface. It should be placed in tight bags for removal to waste disposal sites.

Operation of electrical equipment

Installation of new equipment, major repairs and modernization of existing electrical equipment must be carried out in accordance with the design documentation.

Workers servicing electrical equipment(hereinafter referred to as electrical technical personnel), are obliged:

– ensure normal, trouble-free operation of all electrical receivers in accordance with the project and the requirements of the relevant regulatory legal acts, including technical regulatory legal acts, as well as the designed levels of illumination in all rooms of the hotel and its territory;

– replace faulty electrical equipment;

– carry out periodic inspections of electrical equipment.

Hotel workers should be aware of the possibility of injury electric shock, safety measures and measures to provide first aid to someone under voltage.

Guests staying in the rooms must be warned about the prohibition of using electric heating devices in the rooms, with the exception of electrical personal hygiene appliances (electric razor, electric massager, electric hair curlers, etc.).

To connect harvesting machines special plug sockets with a third grounding contact must be installed in corridors.

In bathrooms, toilets, toilets, showers, changing rooms in shower rooms It is not allowed to install switches and plug sockets.

Installation of plug sockets for electric shavers and hair dryers in bathrooms is allowed only if they are powered through an individual isolation transformer.

Ironing rooms with conductive floors should have insulating floor mats rigidly attached to the floor or dielectric mats glued to the floor.

The working surface of the ironing table must be made of insulating materials (wood, heat-resistant plastic, etc.). The table must be positioned so that the person using the iron cannot simultaneously touch the body of the iron and grounded parts of the equipment or conductive structures or surfaces. The iron stand must be made of insulating material.

Washing, drying, drying and ironing machines, ironing press, centrifuge, elevator must be equipped with mechanical and electrical interlocks that prevent the electric motor from starting when hatches, doors or fences are open.

The serviceability of interlocks must be checked before the start of each shift.

The washing machine, ironing press, and other electrically driven machines must be assigned serial number, placed in a visible place.

All starters and control buttons must be clearly labeled indicating which machines they apply to.

Persons with the appropriate profession (position) who have been duly trained in safe methods and techniques of work and assigned an electrical safety group (II – V) are allowed to carry out operational maintenance and inspection of the hotel’s electrical installations.

The number of electrical personnel performing repairs, cleaning and inspection of electrical installations is determined by the person responsible for electrical equipment.

Personnel with an electrical safety group below III are prohibited from single-handedly carrying out work related to access to live parts of equipment.

Exploitation lamps without protective glass, lenses or grilles provided for by the design is not allowed.

Lamps common use must undergo periodic inspection and cleaning at least 2 times a year.

Cleaning of lamps should be combined with the replacement of burnt-out lamps, starters, replacement of failed reflectors, protective caps and other elements of lamps.

Electrical personnel performing work in electrical installations, must be provided with protective equipment in accordance with the requirements of regulatory legal acts and standards for equipping with protective equipment for workers in electrical installations. The protective equipment issued must correspond to the working conditions and ensure labor safety.

Electrical personnel must be trained in the rules for using protective equipment and instructed in the use and care of protective equipment.

Electric stoves installed in restaurants, buffets and other hotel premises must be grounded.

The group power supply network of the electric stove must be protected from overloads and short circuits protection devices installed only in phase conductors.

Electric stoves connected to a three-phase network must be protected by three-phase circuit breakers.

Current repairs of electric stoves must be carried out according to a schedule approved by the person responsible for the electrical equipment of a hotel or restaurant, at least once every 6 months.

Electric stoves must be installed at a distance of at least 0.5 m from grounded equipment. If it is impossible to ensure the specified distance, the installation of enclosing structures must be provided.

Equipment operation

Operation of equipment used in hotels must be carried out in accordance with the requirements of the operating documentation of manufacturing organizations, regulatory legal acts, including technical regulatory legal acts.

Operation of equipment without fencing devices, safety devices, interlocks, alarm systems and other means of collective protection provided by the design is not permitted.

The placement and operation of equipment in premises and workplaces should not pose a danger to workers.

The equipment should not have sharp corners, edges or uneven surfaces that pose a danger to workers.

All moving, rotating and protruding parts of equipment and auxiliary mechanisms must have protective guards to prevent the possibility of injury to workers.

Opening doors, covers, equipment panels must have devices that prevent their accidental removal and opening.

Guards that open upward must be locked in the open position.

Fences that, due to operating conditions, do not require frequent removal should be dismantled only with the help of metalwork tools.

A fence that is periodically opened manually must be painted on the inside in a signal color.

Depending on the type of hazard, a safety warning sign is applied or attached to the outside of the fence.

The hazardous area of ​​the equipment, where operating conditions make it impossible to completely enclose it, must have a non-contact lock.

The design and location of equipment controls must prevent spontaneous changes in their position due to vibration and other influences.

Equipment components that are dangerous for maintenance must be painted in identifying colors and have safety signs in accordance with the requirements of technical regulatory legal acts.

Auxiliary operations (cleaning, lubrication, cleaning, changing tools and devices, adjusting guards, safety and braking devices and the like), as well as equipment maintenance and repair work must be carried out with the equipment turned off. On starting devices Posters are hung: “Don’t turn it on! People are working!”

It is not allowed to work on faulty equipment, if there is a malfunction of instrumentation, grounding devices, technological equipment, tools, protective fences, interlocks and devices, electrical equipment, starting equipment, buttons and control handles.

Currently, all hotels are computerized (PC), so when working with a PC, workers may be subject to adverse effect the following are dangerous and harmful production factors:

· increased level of electromagnetic radiation;

· increased level ionizing radiation;

· increased level of static electricity;

· increased electrostatic field strength;

· increased or decreased air inonization;

· increased light brightness;

· direct and reflected gloss;

· increased voltage in an electrical circuit, the closure of which can occur through the human body;

· static overloads of the musculoskeletal system and dynamic local overloads of the muscles of the hands;

· overstrain of the visual analyzer;

· mental stress;

· emotional overload;

· monotony of work.

To reduce the level of electrostatic field strength, screen protective filters are used if necessary. During operation, the protective filter must be tightly installed on the monitor screen and grounded.

To ensure optimal microclimate parameters, regular ventilation and daily wet cleaning rooms, air humidifiers are used.

Prohibited:

· install the system unit in closed furniture volumes, directly on the floor;

· Use sockets and extension cords that are not equipped with a grounding contact (bus) to connect the PC.

Baggage transportation

When transporting luggage on a trolley, do not load the trolley beyond its carrying capacity.

Transported luggage must be placed evenly over the entire area of ​​the trolley platform. Heavier loads should be placed at the bottom and lighter ones at the top.

When placing high-stacked luggage on a trolley, the load must be secured to prevent it from falling.

It is necessary to move the cart along the surface only in the direction “away from you”, always being behind the cart being moved.

Room service

Work on servicing hotel rooms must be carried out in accordance with the requirements of Sanitary norms, rules and hygienic standards"Hygienic requirements for the design, equipment and maintenance of hotels."

Before starting work on cleaning the premises, you should inspect the premises, remove objects that are in the way or could cause injury - blades, needles, nails, buttons, glass fragments, etc.

Cleaning of premises should be carried out in sufficient lighting.

Hotel staff who have been trained in safe methods and techniques and assigned electrical safety group I may be allowed to work with vacuum cleaners and other cleaning machines.

Special carts must be used to transport cleaning equipment and materials. The cart should have space for placing laundry, a vacuum cleaner, a box with chemicals, a broom and dustpan, rags and a trash can.

Leave in aisles, driveways, doorways and the like, cleaning equipment and cleaning products are not allowed.

The ladders (ladders) used must be tested for static load.

Before starting glass cleaning work, window frames The strength of the fastening of the glass and the frames themselves must be checked.

Special electrical appliances (floor polisher, vacuum cleaner, cleaning machine, etc.) and cleaning equipment used during cleaning must be used in accordance with the cleaning technology.

When cleaning, you must use only working electrical appliances and cleaning equipment. Maids are prohibited from making repairs themselves.

When operating electrical appliances, the operating mode specified in the operating instructions of the manufacturer must be observed.

Before connecting electrical appliances to the network, you should check that the insulation of wires and plugs is in good condition, and that the voltage indicated on the device matches the voltage in the network. Do not use electrical appliances with a damaged cable or plug.

It is not allowed to bend electrical cords, pinch them in doorways, or stand on them with your feet.

When working with electrical appliances, it is prohibited:

· leave them connected to the network unattended;

· disconnect by pulling the plug from the socket by the cord;

· move by power cord.

It is prohibited to place rags or other objects on electrical appliances and heating devices.

Electric machines used for cleaning must be equipped with sound and light alarms.

Cleaned areas in common areas should be fenced off with special warning signs.

Used electrical appliances and cleaning equipment should be stored clean and in good working order in the rooms designated for these purposes.

Cleaning the dust collection tanks of vacuum cleaners should be done with the vacuum cleaner disconnected from the power supply.

Cleaning of lampshades and other electrical fittings should be carried out when the power supply is turned off.

It is prohibited to wipe switches, repair electrical wiring, switches, plug sockets, install or change electric lamps, or touch bare wires.

Heated floors must be turned off before cleaning. Detergent compositions used in the care of electrically conductive floor coverings, should not lead to a decrease in electrical conductivity.

Electrical sockets, switches and lighting fixtures are not allowed to be wiped with a damp cloth.

To prevent slipping, floors should be wiped dry after washing.

Any liquid or water spilled on the floor should be cleaned up immediately.

Cleaning sanitary facilities must be made using necessary funds personal protection.

When carrying hot water in buckets, it is necessary that the buckets are not full and have lids.

Heat the floor polishing paste only on a closed electric stove. metal vessel in a water bath.

When serving food to hotel rooms, the connection between the main catering unit dispensing unit and the residential part of the hotel must be provided through service corridors and stairs, an elevator or using special lifts.

When providing food delivery services to your room, you must use a special cart.

When transporting, you should use serviceable carts, and move the carts in the direction away from you.

When carrying hot food, do not press the dishes towards you.

The lids of dishes with hot food should be opened carefully towards you.

Dishes containing hot food must be placed securely on the trolley.

When coming into contact with hot surfaces of equipment and kitchen utensils, hand protection should be used.

Chemicals (detergents, cleaners, disinfectants, protective varnishes, mastics, crystallizers, etc.) used during cleaning must be used in accordance with the requirements of the manufacturer’s instructions.

For storing and preparing used detergents and disinfectants a separate room must be allocated.

The design of racks for storing chemicals must be designed for appropriate loads, ensure a stable position of stored materials and prevent them from falling during storage.

When using several cleaning products simultaneously during the cleaning period, it is not allowed to mix them with each other in order to prevent the formation of harmful substances or gases.

Chemicals should be stored only in the original packaging of the manufacturing organizations.

Do not leave diluted (mushy) bleach in indoors, and also fill it hot water to avoid intense formation of harmful gases.

It is prohibited to use gasoline, kerosene, acetone, turpentine, or other flammable and combustible liquids for washing floors, window frames, furniture and the like.

Chemical products must not be stored in open containers.

All chemical containers must be clearly labeled with the name.

The chemicals used should not cause harmful effects on workers.

When working with chemicals that contain harmful substances or release them during use, personal protective equipment must be used in accordance with the instructions of the manufacturer.

Use foreign-made chemicals that do not have instructions for their use. safe use in Russian or Belarusian is prohibited.

By clicking on the "Download archive" button, you will download the file you need completely free of charge.
Before downloading this file, remember those good essays, tests, term papers, theses, articles and other documents that lie unclaimed on your computer. This is your work, it should participate in the development of society and benefit people. Find these works and submit them to the knowledge base.
We and all students, graduate students, young scientists who use the knowledge base in their studies and work will be very grateful to you.

To download an archive with a document, enter a five-digit number in the field below and click the "Download archive" button

Similar documents

    Placement of hotels in the planning structure of the city. Basic principles that are taken into account when constructing hotel buildings. Requirements for hotels of different categories. Typology of foreign hotels. International classification hotel rooms.

    lecture, added 02/08/2011

    The concept and history of the development of the hotel industry. Classification and characteristics of types of hotels. The essence of hotel services and studies of basic hotel services. Development of practical recommendations for improving the process of serving tourists.

    course work, added 01/08/2016

    Features, characterizing hotel enterprises and similar accommodation facilities. Functional structure of hotels, motels and campsites. Urban planning requirements for them. Residential premises with a floor-to-floor service complex.

    abstract, added 12/25/2014

    Basic criteria for hotel classification. Classification hotel enterprises according to comfort level. Feature of the German classification. Classification of hotels in Russian Federation. Room capacity. Assignment of business class numbers.

    abstract, added 03/06/2011

    The specificity of hotels lies in the variety of functions of the facilities. The main elements of the hotel complex equipment. Choice architectural style for a specific hotel facility. The role of interior and hotel design in promoting the hotel business.

    course work, added 03/02/2009

    Classification of hotel chains by MGA categories. The secret of the success of this form of service, the forecast for their development in the CIS countries. Prospects for the development of small hotels. Role application programs, ensuring the activities of hotels, the use of the Internet.

    presentation, added 01/17/2012

    International classification of hotels. Requirements of classification systems for 5-star hotels. Unique luxury apartments, presidential suites, rooms at the Grand Hotel Europe in St. Petersburg. The situation in the hospitality industry market.

    course work, added 01/21/2011

At any enterprise (plants, factories), proper air supply is of great importance, as well as water cooling, which is necessary in any technological process. For these purposes, special systems equipped with fans are used. Various pumps and fans are the 2017 rules for the technical operation of hotels and their equipment to stabilize the temperature process in production. Special machines control flow electrical energy and absorb noise effect.

Any retail enterprise that sells food products uses scales. Modern scales are an automatic device that accurately measures the weight of goods. The device is equipped with a display, as well as a special keyboard, due to which the devices and equipment used during repairs determine and display the necessary information for the seller and the client. The scales can be operated from electrical network, or charged from a battery (portable version).

In any office or enterprise, with the help of special devices, it is supported optimal temperature air, and air exchange. This is necessary to organize a comfortable work process. Among the types of devices used for rental of commercial equipment in Donetsk: hoods, air conditioners of various modifications, ventilation shafts with natural and artificial cooling. Ventilation can be exhaust, supply and mechanical.

Important: Rules for the technical operation of hotels and their equipment 2017

At enterprises producing food products, use various machines that provide an automated work process. The installed automation can be classified into Russian CNC machines for metal according to certain signs. This various groups machines that differ in their functions. All technological operations can be classified according to the principle of the work performed, according to the device and methods of execution.

Enterprises that produce semi-finished products for sale in food supermarkets are equipped with special refrigeration units. The freezers are an edge banding machine scm olimpic 80, with which finished products stored certain time in warehouses. Ready-made semi-finished products enter the freezers via a special conveyor, which is equipped with a spiral belt.

MINISTRY OF HOUSING AND COMMUNAL SERVICES OF THE RSFSR

TECHNICAL OPERATION OF HOTELS AND THEIR EQUIPMENT

Approved

by order of the Ministry

housing and communal services

farms of the RSFSR

MOSCOW STROYIZDAT 1985

1. BASIC PROVISIONS

GENERAL INSTRUCTIONS

HOTEL MANAGEMENT

HOTEL ACCEPTANCE PROCEDURE

HOTEL INSPECTION SYSTEM

REPAIR AND IMPROVEMENT OF THE HOTEL FACILITY

ORGANIZATION OF OPERATION OF THE HOTEL FACILITY

2. OPERATION OF BUILDING STRUCTURES AND HOTEL PREMISES

FOUNDATIONS AND WALLS OF BASEMENTS

COLORS

PARTITIONS

WINDOWS AND DOORS

STAIRS

SPECIAL EVENTS FOR TECHNICAL OPERATION OF THE BUILDING

Protection wooden structures from destruction by house fungi and wood-destroying insects

Eliminating dampness in existing buildings

Elimination of noise in buildings

Preparing hotels for winter

OPERATION OF RESIDENTIAL AND AUXILIARY PREMISES OF HOTELS

Residential and utility rooms

Stairwells

Attic spaces

Basements and technical undergrounds 1

3. RULES FOR THE OPERATION OF HOTEL ENGINEERING EQUIPMENT

CENTRAL HEATING

HOT WATER SUPPLY

VENTILATION

AIR CONDITIONING

WATER SUPPLY AND SEWERAGE

INTERNAL ROOF DRAINS

GAS SUPPLY

WASTE AND DUST REMOVAL

ELECTRICAL EQUIPMENT

ELEVATORS AND SUPPORTS

RADIO AND TELEVISION

AUTOMATION, ENGINEERING EQUIPMENT CONTROL, COMMUNICATIONS AND INSTRUMENTS

DISPATCHING SERVICE

MAIN WAYS TO SAVE HEAT AND ELECTRIC ENERGY

INVENTORY AND ITS CONTENTS

4. RULES OF OPERATION OF THE TERRITORY ADJACENT TO THE HOTEL AND CARRYING OUT SANITARY AND HYGIENIC MEASURES

TECHNICAL MAINTENANCE, CLEANING, SANITARY CLEANING, GREENING OF THE TERRITORY

SANITARY AND HYGIENIC REQUIREMENTS FOR THE HOTEL

5. SAFETY RULES, OCCUPATIONAL HEALTH AND FIRE SAFETY FOR OPERATION OF HOTELS

HEALTH AND SAFETY RULES

FIRE SAFETY RULES

APPENDIX 1 Acceptance certificate of a hotel or hotel management upon change of director or chief engineer (engineer) of the hotel (hotel branch)

APPENDIX 2 Time frames for troubleshooting when performing unscheduled current repairs individual parts hotel buildings and their equipment

APPENDIX 3 Ventilation and air conditioning systems in hotel rooms

APPENDIX 4 Lowest illumination of hotel premises

APPENDIX 5 Acceptable levels sound and sound pressure and corrections to them

APPENDIX 7 Improving operational sustainability and water flow control data in hotel water supply systems

APPENDIX 8 Operating modes of air-heat curtains and air heating in hotels

APPENDIX 11 Forms of logs and safety briefing registration checklist

APPENDIX 12 List of professions of hotel workers associated with the performance of high-risk work, subject to annual training and testing of safety knowledge at enterprises (organizations) of the housing and communal services system of the RSFSR

APPENDIX 13 Individual evacuation plan

APPENDIX 14 Standards primary funds fire fighting

APPENDIX 15 Requirements for the maintenance of fire-fighting equipment and fire-fighting automatic systems

APPENDIX 16 Depreciation rates for fixed assets of the national economy of the USSR

APPENDIX 17 Standard average service life of public buildings, their structural elements finishing and engineering equipment

Rules for the technical operation of hotels and their equipment / Ministry of Housing and Utilities of the RSFSR. - M.: Stroyizdat, 1985.

The basic provisions for the technical operation of premises are given, building structures and engineering equipment of hotels, as well as instructions on the maintenance of the territory, safety precautions, labor protection and fire safety when operating hotels.

For workers involved in the technical operation, maintenance and repair of hotels.

Developed by AKH im. K.D. Pamfilova of the Ministry of Housing and Communal Services of the RSFSR (candidates of technical sciences E.M. Arievich, E.I. Afanasyeva, A.S. Vladychin, engineer V.E. Likhachev) with the participation of the State Unitary Enterprise for Housing and Communal Services of the RSFSR (engineer M.A. Kuzmina), Department high-rise buildings and hotels of the Moscow City Executive Committee (engineer S.L. Mininberg), TsNIIEP of engineering equipment of the State Civil Engineering Committee (candidate of technical sciences A.N. Dobromyslov, engineer A.A. Shamulyunov), MIIT of the USSR Ministry of Higher Education (candidate of technical sciences K M. Cheremisov).

With the entry into force of these Rules, the “Rules for the technical operation of hotels and their equipment”, M,: Stroyizdat, 1976, become invalid.

Editors - Eng. R.B. Velsky (Ministry of Housing and Communal Services of the RSFSR), Ph.D. tech. Sciences E.M. Arievich, engineer V.E. Likhachev (AKH named after K.D. Pamfilov of the Ministry of Housing and Communal Services of the RSFSR), engineer. S.L. Mininberg (Department of high-rise buildings and hotels of the Moscow City Executive Committee).

1. BASIC PROVISIONS GENERAL INSTRUCTIONS

1.1. The task of technical operation of the hotel stock is to ensure the good condition of structures, parts of buildings and engineering equipment of hotels for their uninterrupted operation within the standard service life, timely implementation of scheduled maintenance, ensuring proper improvement and sanitary condition of the building and the adjacent area.

Technical operation of the hotel fund includes Maintenance and all types of repairs.

Costs for the maintenance and repair of hotels must be planned within the established standards, taking into account their technical condition (see Appendices 16, 17).

1.2. The rules for the technical operation of hotels and their equipment are mandatory for all organizations of executive committees of local Soviets of People's Deputies, ministries, departments, enterprises, and institutions that have jurisdiction over the hotel fund on the territory of the RSFSR.

1.3. Knowledge and compliance with these Rules in practice is mandatory for all workers involved in the technical operation and repair of hotel buildings and their engineering equipment.

Managers responsible for the technical operation of hotels are obliged to ensure the study and testing of knowledge of the rules and regulations of higher organizations and local Councils of People's Deputies on the technical operation of the hotel fund by employees under their subordination.

1.4. The following categories of engineering and technical workers are required to study the rules and pass exams on them:

a) heads of housing and communal services departments of the region (region) of the city executive committees and ministries of housing and communal services of the Autonomous Soviet Socialist Republic, engineering and technical workers of utility enterprises, responsible for organizing the technical operation of the hotel stock, planning and economic activities of hotels;

b) managers, chief engineers (engineers) of hotel associations, engineering and technical workers involved in organizing the technical operation of the hotel stock, planning and accounting for the economic activities of the hotel industry;

c) heads, chief engineers (engineers) and technicians of departments of ministries, departments, enterprises, organizations, institutions involved in the technical operation of the hotel fund.

Engineering and technical workers who are responsible for the operation of engineering equipment, the maintenance of hotel buildings and adjacent territories, engineering and technical workers of specialized organizations for the operation and repair of hotel facilities, as well as all workers must study and pass exams on these Rules to the extent of their specialties.

1.5. Acceptance of examinations for working and newly hired engineering and technical workers, and workers in the scope of these Rules, as well as special instructions related to the operation of the hotel fund, is carried out by a qualification commission, the composition of which is established by order of the head of the hotel or a higher organization.

New applicants must pass exams within three months. An employee who passes the exams is issued a corresponding certificate.

Hotel workers must take the repeat exams, and according to these Rules - after 2 years.

1.6. Administrations, associations of hotels, public service plants with hotel stock in areas with special conditions(with subsidence soils, mine workings, seismic impacts and permafrost), the following work must be performed:

to conduct observations of the technical condition of buildings and engineering equipment during their operation;

to prevent and eliminate damage to buildings from the effects of subsidence during soaking of subsidence soils, collapse of the roof of mine workings, thawing of permafrost soils and the action of seismic forces;

to eliminate the consequences of damage that has already occurred in the zones of influence of these impacts in accordance with the “Rules and. standards of technical operation of the housing stock" (M., Stroyizdat, 1974).

1.7. For violation of these Rules, those responsible will be held accountable in the prescribed manner.

1.8. Responsibility for the implementation of these Rules rests with the heads of operating organizations 1) .

1) Management, associations of the hotel industry, municipal enterprises, as well as hotels, are hereinafter referred to as “Operating organizations”.

HOTEL MANAGEMENT

1.9. The hotel fund is subordinate to the executive committees of local Soviets of People's Deputies.

1.10. The hotel (departmental) fund of enterprises, organizations and institutions is subordinate to them.

1.11. Hotels in their activities are guided by the rules, regulations, instructions, orders and circulars developed and approved by the Ministry of Housing and Communal Services of the RSFSR. The Ministry reviews technical documentation for the construction and reconstruction of hotels (except for Moscow and Leningrad), ensures the allocation of funds for materials and equipment, and provides technical assistance in the operation of hotels.

To manage the work of the hotel industry of the RSFSR, within the Main Directorate of Public Utilities Enterprises (GUPKO) of the ministry, a “Hotel Management Department” was created, which exercises control over issues related to the operation of the hotel fund, and a “Department of Design, Construction and New Equipment”, which is entrusted with improving the design, construction and implementation of new equipment in the hotel industry.

Notes: 1. Organization of reception, accommodation and service of citizens in hotels located in the regions Far North and equivalent areas is regulated by rules and regulations common to all hotels. Payment for the use of places in these hotels has been increased by 30%.

2. When receiving foreign tourists in communal hotels, one should be guided by the rules for the reception and service of foreign tourists in hotels, motels and campsites on the territory of the USSR of the State Committee for Foreign Tourism under the Council of Ministers of the USSR.

1.12. The executive committees of local Councils of People's Deputies and their municipal bodies exercise control over the technical operation of the hotel fund of local Councils, as well as other enterprises, institutions and organizations located in. their subordination.

1.13. Management of the operation of hotels of local Soviets is carried out depending on local conditions: the Office of High-Rise Buildings and Hotels of the Moscow City Executive Committee (Moscow), the Office of Hotels of the Leningrad City Executive Committee (Leningrad), associations (industrial associations) of the hotel industry of cities, regions and republics, municipal enterprises ( regional centers and workers' settlements), production trusts under the housing and communal services departments of regional executive committees and the housing and communal services ministries of the autonomous republics.

Directorates, associations (together with the city municipal housing and communal services) and factories control the scope of capital repairs and improvement of hotels, contribute to the provision of these works with design documentation, and carry out supervision and control over the technical operation of hotels.

Departments, associations of the hotel industry and municipal enterprises develop organizational and technical measures for the introduction of new technology and scientific organization of labor in the hotel industry, ensure the development, production and implementation of new equipment, mechanisms, inventory and monitor the implementation of organizational and technical measures by hotels, organize control over economic activity hotels, participate in personnel training, and organize social competitions.

The plant of public utility enterprises unites, in addition to enterprises and organizations of public utilities and external improvement, also hotels and is their legal entity. He provides general management and carries out activities to improve work, maintains quantitative and qualitative records of the existing hotel stock, reviews and approves quarterly and annual plans.

1.14. The technical operation of hotels is carried out by service personnel and staff of hotel workers with the involvement of relevant specialized organizations on a contractual basis.

1.15. The hotel management scheme is built depending on its capacity, category and composition: premises and equipment. If a hotel has several buildings, management is carried out by a joint directorate, and in each individual building there is a manager of a hotel building (branch), who carries out general management and is the financially responsible person.

The administrative, managerial and service personnel are staffed in accordance with the current standard staffing levels and standards. The hotel director in his activities is guided by the “Regulations on the work of the hotel director”, the standard hotel charter and documents of higher organizations, and the hotel staff - by standard job descriptions for each category of workers.

HOTEL ACCEPTANCE PROCEDURE

Acceptance into operation of newly constructed hotel buildings

1.16. Acceptance into operation of hotel complexes and individual buildings and structures should be carried out in accordance with the requirements of the chapter of SNiP on the main provisions for the acceptance into operation of completed construction projects.

1.17. When accepting hotels for operation, it is necessary to appoint a responsible representative of the operating organization to participate in the work of the State Acceptance Commission.

1.18. Before the hotel is put into operation, engineering and technical workers must be appointed at least a month in advance and maintenance personnel must be appointed at least two weeks in advance.

Employees of the relevant operation services, at least two weeks before the opening of the hotel, are required to study the documentation for the construction of buildings and check the quality of the work performed.

To set up engineering equipment, the operating organization enters into an agreement with a specialized organization and makes payment after completing the entire scope commissioning work that must be completed before the hotel is put into operation.

1.19. Hotels put into operation must comply with the design and requirements of the SNiP chapter on hotel design standards.

A representative of the operating organization must pay attention to the quality of construction and installation work; reliability of connections of sanitary, electrical networks and other elements of engineering equipment; for access to the most vulnerable areas of structures and equipment for inspection and repair; effectiveness of action drainage systems and waterproofing of the buried parts of the building, yard drains, the quality of landscaping, especially filling the foundation cavities and constructing blind areas around the building; for the availability of as-built documentation, including for hidden structures of the building and for all types of engineering equipment.

1.20. Engineering equipment: water supply, sewerage; hot water supply, central heating, ventilation, air conditioning system, low-current devices (television, radio, alarm, clock, telephone), gas supply, electrical equipment, elevators and garbage chutes are tested in working order in accordance with clause 1.30.

Acceptance of newly built swimming pools and laundries at hotels must be carried out in accordance with the “Rules for the technical operation of bathhouses and laundries” (M., Stroyizdat, 1979).

1.21. At the request of the operating organization, working commission or State Commission Additional tests may be carried out before the hotel is accepted into operation. individual designs and engineering equipment in order to determine their performance qualities.

1.22. Deficiencies discovered by the working commission as a result of inspection or instrumental tests are eliminated by the contractor within the time frame appointed by the commission.

The working commission, with the participation of the operating organization, prepares a summary conclusion on the readiness of individual objects for acceptance into operation by the State Acceptance Commission as a whole.

1.23. Commissioning of hotels with imperfections is not allowed, with the exception of landscaping work, which, if necessary, can be postponed to the next planting period.

1.24. The operating organization accepts the newly commissioned hotel on its balance sheet and is responsible for its operation after approval of the act of the State Commission.

The technical documentation for the constructed hotel and the approved act of the State Acceptance Commission for the acceptance of the hotel into operation must be transferred in one copy to the operating organization. The specified documentation is stored in operating organizations with strict reporting documents.

Note. The size of the premises of the building being accepted must be determined on the basis of the inventory plan drawn up by the Bureau of Technical Inventory.

Acceptance of capitally renovated hotels into operation

1.25. Capitally renovated hotels can be put into operation after completion of all work provided for by the project and estimates for the repair of the building as a whole or its individual parts, as well as work on landscaping the site and connecting all internal communications to existing external networks.

Acceptance of work with deficiencies or letters of guarantee the elimination of deficiencies is not allowed (with the exception of work on landscaping courtyard areas, which cannot be carried out in winter time); in this case, unfinished work must be completed in the next autumn or spring.

1.26. Acceptance into operation of overhauled hotels (regardless of departmental affiliation), as well as after their reconstruction, is carried out by the State Acceptance Commission consisting of responsible representatives: bodies of the State Construction Control Authority, operating organization, contractor, design organization, State Fire Inspection, State Sanitary Inspectorate, State Mining and Technical Supervision, executive committees of local Councils of People's Deputies and other interested organizations.

1.27. Before the convening of the State Acceptance Commission, a working commission is appointed under the chairmanship of a responsible representative of the customer, the head or chief engineer of the operating organization, consisting of heads of technical services, representatives of contracting and subcontracting organizations, as well as workers carrying out technical and architectural supervision in the process of major repairs or reconstruction of the hotel.

The working commission is appointed after receiving written notification from the contractor that the facility is ready for commissioning.

Based on the results of the work, an act of the working commission is drawn up.

1.28. The state commission for acceptance of a completed hotel renovation is convened by the chairman of the commission on the basis of a certificate from the chairman of the working commission on the elimination of defects and deficiencies noted in the report of the working commission.

1.29. The State Acceptance Commission must receive from the contractor the documents for acceptance of the building listed in the “Technical instructions for the production and acceptance of general construction and special work during major repairs of residential and public buildings” (M., Stroyizdat, 1976).

1.30. Tests of engineering equipment (see clause 1.20) are carried out before preliminary acceptance of the hotel by the working commission in working condition in accordance with the requirements of the Technical Instructions given in clause 1.29. The quality of the work required for major repairs is checked, including thermal insulation and identification painting in accordance with GOST 14202-69.

Based on the tests, a corresponding report is drawn up. If there are no defects, a preliminary assessment of repairs and recommendations for acceptance of engineering equipment into operation are given.

If defects are detected, the repair is considered incomplete until they are eliminated.

The final assessment of the quality of major repairs of equipment or systems is given after operating them under load for one month.

1.31. Acceptance by the State Acceptance Commission of completed hotel renovation work begins with familiarization with the technical documentation for the building being repaired, with acceptance certificates for hidden work, repair work or installation of new engineering systems and equipment (central heating, water supply, sewerage, elevators, gas equipment, ventilation, etc.) and a work log. After reviewing the documentation, the State Acceptance Commission inspects the work performed in situ and, if necessary, opens or tests the structures.

1.32. When accepting a capitally renovated building into operation, you must pay attention to:

compliance of the work performed with the approved technical documentation; the quality of these works;

protection of buildings and its individual parts and structures from atmospheric, ground and operational moisture;

reliability of engineering equipment;

completion of works on landscaping and landscaping of the site, provision of drainage surface waters from the building.

1.33. Acceptance of completed work is formalized by an act drawn up in triplicate, of which the first with the relevant attachments is stored in the operating organization, the second in the contracting organization and the third in the higher organization. When acceptance is carried out by the State Commission with the participation of the State Architecture and Construction Control, the third copy of the act remains with him.

Based on the data of the acceptance certificate, the operating organization makes the appropriate notes in the technical passport for the hotel and land plot indicating the scope of work performed and their cost.

1.34. As-built technical documentation for a hotel overhaul in one copy must be transferred to the operating organization and stored along with strict reporting documents.

After a major overhaul, before the start of operation of the hotel, its technical inventory must be carried out.

Acceptance of hotel facilities upon change of management

1.35. When appointing or replacing a director, chief engineer (engineer), or manager of a hotel building, the technical condition of the hotel is inspected and checked, as well as the amenities elements on the balance sheet of the operating organization.

The nature and procedure for the inspection of each building, its parts, equipment and landscaping elements of the area adjacent to the hotel, when transferring the property from one official to another, is established the same as during the next inspection (clauses 1.40-1.50).

1.36. The hotel acceptance committee includes:

representative of a higher organization (chairman);

newly appointed official;

an official being released from work;

chairman of the trade union organization;

chief accountant (accountant) of the hotel.

When accepting individual hotel buildings, the chairman of the commission is the manager or chief engineer of the hotel, the members of the commission are the above persons.

1.37. The technical documentation for the transfer of hotel management from one manager to another includes:

act of the State Commission (with all attachments) on acceptance of the hotel building into operation, utility networks and equipment;

site plan with buildings and structures located on the territory of the hotel (building);

floor-by-floor: plans and sections of buildings and structures;

drawings of yard and internal networks of water supply, sewerage, central heating, heat, gas, and electricity, etc.;

Boiler management passport, boiler books;

passports for elevators;

projects, estimates, lists of defects for repair work, acceptance certificates for completed repair work and other documents for the repair of buildings;

technical passports for the hotel and land plots.

1.38. In the absence of technical documentation specified in clause 1.37, the new official is obliged to take measures to obtain, restore or compile the missing documents.

1.39. The act of handing over and acceptance of hotel facilities from one official to another (see Appendix 1) is approved by the head of a higher organization no later than ten days from the date of its preparation.