Sequence of actions in repair. In what sequence are renovations carried out in an apartment?

Subscribe
Join the “koon.ru” community!
In contact with:

If you are planning to make serious repairs in a separate room or an apartment as a whole, you should draw up full plan works and cost estimates, including items such as dismantling old equipment (batteries, window sills, lamps, switches). If you need to replace windows and doors, include cleaning and removal of construction waste in the list of works. In most cases, this is a significant expense item, especially in an apartment building within the city.

It is very important to determine the actual scope of work and correlate it with your financial capabilities. It is extremely undesirable to make adjustments after the start of repair and finishing work - for example, after painting the walls, you want to lay parquet instead of laminate or stick wallpaper instead of decorative plaster. Therefore, all design decisions must be made before the actual start. repair work. Remodeling is expensive, time consuming and sometimes impossible.

Where to start renovating a room?

Having coped with preparatory process and finding yourself in front of bare, tattered walls, you still do not fully imagine the full scope of the upcoming expenses and work. However, you can already figure out where and what will be located, what colors are optimal in a particular room and where the computer, TV and other electrical equipment will be installed. We definitely pay attention to the location of the windows and the need for additional lighting in the rooms. For what? Because repairs should begin with equipment or re-equipment of the electrical network, including the location of lamps - main and additional.

This needs to be done both in old apartments that are being completely renovated, and in new buildings. It's no secret that in new houses the wiring is installed without taking into account the wishes of the owner. Each new resident invariably has the desire to adapt housing to their needs as much as possible. The abundance of electrical equipment requires an optimized, powerful electrical network with many branches. Very uncomfortable in new apartment unwind all kinds of extension cords and install additional sockets.

In parallel with electrical network The air conditioning system and fastening elements for heating network devices should be installed. It is also necessary to perform work that requires chiseling, drilling, cutting grooves, scratches, recesses and other deformation of walls, floors and ceilings, accompanied by the formation of dust and fragments of brick, concrete and plaster. Then we calmly remove the garbage and begin preparing the base of the future floor. There are several options here:

  • installation of rough plank flooring;
  • pouring concrete screed;
  • preparation for installation of heated floors;

What's next?

Next stage repair work concerns windows. If replacement is required, we replace it. If the windows are already installed and satisfy your request, then we skip this stage, not forgetting to inspect the condition of the slopes, the presence of thermal insulation, and sealing of cracks. It is worth checking how the doors open and close, whether there are any distortions, what the vertical and horizontal levels are. It is very difficult to eliminate these seemingly obvious defects after plastering and painting the walls or gluing wallpaper. It is also advisable to install internal window sills. Plastic film will help protect them from splashes of paint and putty.

Of course, this work can be done later, during installation. interior doors, but this option is more practical.

If the walls in the room require additional leveling and a significant amount of work before painting, then calculate the total amount building mixtures necessary to process all walls to be repaired. Building materials, despite their high cost, should always be taken with a small reserve. It is very inconvenient to run after a bag or two of putty, which, as a rule, runs out at the most inopportune and crucial moment.

Sequence of work on repairing and finishing a room: frequently asked questions

What comes first: floor screed or wall plaster/putty?

The answer to this question is clear - before starting to finish the walls, it is necessary to complete all preparatory work with the floor. It must be ready, after cleaning, for installation of decorative flooring.

The floor covering is installed in last resort, be it laminate, parquet or self-leveling flooring with a 3 D effect. The prepared floor base is covered with cardboard or film - this will make it easy to remove traces plastering works, and such ones arise inevitably.

Before starting puttying and plastering work, you need to complete all manipulations with drywall, if any. All partitions, niches, decorative and functional details must be made before the start of the “wet” finishing phase. All work of this kind, including leveling the ceiling, must be completed in one technological cycle, so as not to return to it, remembering, for example, that “somewhere here” a niche for storing skis or installing a safe is planned.

What comes first: flooring or installing doors?

Any type of flooring should be laid before installing interior doors. This will help avoid mistakes when installing them and achieve a minimum gap between the threshold or floor plane and the door leaves. Installing a door is a clean and precise job that does not require the use of solutions, glue or other substances that can stain a clean floor. The tools used in this case are not able to damage it, if worked carefully.

But this applies directly to the door. The door frame can be installed earlier - before leveling the walls. This will remove all the cracks and irregularities near the opening. If the walls and openings are initially ideal, you can postpone the installation of the box until later. When installing the box ahead of schedule, it is important to take into account the height of the future floor covering!

What to do first: glue wallpaper or lay laminate (parquet, carpet)?

Wallpaper of any type is glued to the prepared walls before work on laying the decorative flooring begins. This is also true for painting walls.

True, there are different opinions on this issue. Supporters of the second option answer this question in the same way as the question of what comes first: paint the ceiling or glue the ceiling plinth. According to their position, wallpaper is glued after installing the floor and ceiling plinth, because the wall decoration can be replaced at any time without touching the plinths either from below or from above. And the edges of the wallpaper can simply be cut evenly to the level of the baseboard.

Painting the ceiling is done after installing the upper plinth. In this case, it is very convenient to eliminate all the unevenness and looseness of the connection, and then the baseboard and ceiling are painted in one step and look monolithic.

What comes first: suspended ceiling or wallpaper/painting?

The specificity of suspended ceilings allows them to be installed at the final stage of repair work, after painting the walls and wallpapering. This work is very clean, and it is quite difficult to damage the walls or floor while doing it.

The principle of work order “top to bottom” does not work in this case. It concerns mainly traditional repair work. New technologies are making their own adjustments. The installers themselves stretch ceiling, it is recommended to invite them to the end of the renovation.

If you make a short list of the sequence of repair work in a room, it will look like this:

  • wiring;
  • heating and air conditioning system;
  • preparation of the floor base;
  • dismantling/installation of windows;
  • preparing walls for wallpaper or painting;
  • ceiling (all works);
  • painting walls or wallpapering;
  • finishing floor;
  • door installation;
  • thresholds and floor plinth;
  • stretch ceiling.

This order is not an axiom. Each master chooses the sequence that is convenient for him. But in general the order looks something like this.

How to paint a ceiling without streaks? What are the causes of stains and streaks and how to fix them?

At what height should sockets and switches be placed?

How to repair a hole in a wall?

How to remove old wallpaper from walls?

www.domfront.ru

Room renovation: where to start?

The very first thing to do before starting renovations in any room is to understand what we want to achieve as a result.

Ask yourself a few questions:

  1. What should the room look like after renovation?
  2. What would you like to leave unchanged?
  3. What is the first thing you don’t like and needs to change?
  4. What wishes do the people who will use it (for example, other family members) have regarding the appearance of the room?
  5. Do you need a major overhaul or will a cosmetic one be enough?

You can think through the details of the appearance of the room yourself. If this is difficult, you will have to contact a professional designer. This stage should not be postponed until later, they say, let’s start the repairs and then we’ll see what happens. A lot depends on what we want the room to look like - from the choice of materials to the execution itself. different types works It’s better to think through everything in advance than to redo it later.

Preparation stage

So, the future appearance of the room has been thought out. Before you begin any manipulations in the room, you need to take the following steps.

  • Describe the sequence of repair work in as much detail as possible.
  • Research information about the materials you plan to use and all the types of work you plan to do yourself.
  • Select the start and end date of the repair, set aside a period for preparation. This is necessary so that the goal is clearly defined, and the repair does not drag on for many months.
  • Calculate the amount of required construction and finishing materials.
  • Select and buy all the building materials and tools that you will need throughout the renovation.
  • Decide who will carry out the repairs. Think about whether you will do everything yourself, find helpers, or still certain types entrust the work to hired specialists.
  • Order windows and doors in advance to avoid delays while waiting for them to be completed.
  • Consider how and where the garbage will be disposed of. In any case there will be a lot of it.
  • Mark out the new location of switches and outlets.

Advice: building materials should always be purchased with a small reserve.

Preparing the room for renovation

Let's consider the option overhaul in a living room, which involves not only changing wallpaper, baseboards, updating paint on the ceiling and walls, but also replacing windows, doors, electrical wiring and other large-scale events.

Before you begin the repair itself, you need to:

  • empty the room of furniture and other things - the room should remain completely empty;
  • remove from the walls and ceiling everything that can be screwed to them, leaving them empty;
  • remove old wallpaper, remove tiles, old flooring (if the floor remains unchanged, you need to take care of its safety, for which you should cover it with durable film);
  • cover the doorways with a damp sheet so that later construction garbage did not scatter throughout the apartment.
  • remove the doors;
  • remove the old wiring, remembering to turn off the power supply;
  • dismantle old heating radiators if you decide to replace them.

Sequence of repair work

The room renovation plan is drawn up individually depending on what work will be carried out. In order to compose it, you need to know where to start. Experts recommend an approximate sequence of actions, which does not have to be strictly followed, but should be kept in mind.

  • It is advisable to start with replacing windows, including window blocks, window sills, slopes. After installation, the windows must be closed to avoid contamination and scratching. plastic film, the window sills are covered with hardboard.
  • The electrical is being changed. The old wiring has already been removed, the channels for the new are being cut. After which the cable is laid, and the channels are covered with plaster.
  • Heating radiators are installed.
  • The ceiling and walls are leveled, rough preparation of the floor is carried out (screed, insulation).
  • The ceiling is completely finished, right down to painting and gluing the molding.
  • If parquet or laminate is chosen as the floor covering, it is laid after wallpapering. The piece parquet is laid earlier, scraped and covered with the first layer of varnish. After which you need to glue the wallpaper, and only then the parquet is covered with subsequent layers of varnish.
  • New doors are being installed. You can change windows and window sills not only at the very beginning, but also at this stage.
  • Wallpaper is being glued.
  • Skirting boards and trim are attached.
  • Holes are drilled for wall shelves, cornices, pictures, etc.

Renovating a room from start to finish is a rather long, labor-intensive task that requires a variety of skills and, in addition, patience. But once you arrange the furniture in your updated room, you'll be pleased to know it was worth it.

mr-build.ru

Where to start renovating an apartment and finish it in the shortest possible time

Where to start renovating an apartment so that the repair work does not drag on for an indefinite period, and the end result undoubtedly pleases you, this is what will be discussed in today’s article. Apartment renovation requires serious preliminary preparation. The most important point is to draw up a detailed plan for future repairs, taking into account the smallest nuances. Let's consider, point by point, the advice of professionals on proper organization repair work in houses and apartments.

First of all, you need to decide on the complexity and scope of future repairs. To make an apartment bright and clean, sometimes it is enough to carry out cosmetic, superficial repairs: replacing wallpaper, whitewashing the ceiling, replacing old linoleum, painting walls, etc.

If you want to completely get rid of everything boring and old, decide on a major renovation with replacing windows, leveling walls, installing new floors and modern ceilings. Your home will be transformed and become new and beautiful.

You should not refuse the help of experienced specialists when carrying out major repairs. This is especially true for creating modern design of your apartment, including redevelopment and demolition of some walls and partitions.

Plan repair work based on your financial capabilities.

Decide on interior design and renovation plan

First, decide on the interior and design of each individual room that you plan to change in your apartment. You can seek advice from a professional designer, which will slightly increase your total financial expenses for repairs. For rooms where repairs will be carried out, it is necessary to make detailed drawings of the successive stages of repair work.

We recommend completing five detailed renovation sketches for each individual room. In the first drawing, show the top view of the room, and in the other four drawings, show each wall. Supplement each drawing with a detailed description and plan for the sequential implementation of repair work, which will allow you to avoid omissions and inaccuracies in the work.

  • Consider the placement of furniture. Those walls that will be most noticeable need to be given Special attention and apply the highest quality finish.
  • Consider where it is best to place lamps and chandeliers so that the light illuminates the room as much as possible.
  • Considering the location of household appliances, indicate locations for sockets. To then competently design the installation electrical wiring in all rooms.
  • Consider the location of the main decorative elements: paintings, mosaics, brick walls.

In the renovation plan, you need to indicate the desired finishing option: wallpapering the walls, painting, etc. To divide the room into separate zones, designers recommend painting one of the walls with a different color in order to focus attention on it and visually divide the room. These points also need to be reflected on the plan.

Determine the order of renovation of rooms

According to the advice of experienced specialists, in order to avoid excess dirt and dust when carrying out repair work, it is recommended to first carry out repairs in rooms farthest from front door. As the final stage of renovation, it is advisable to choose passage rooms and a corridor through which people constantly rush Construction Materials and tools. This is necessary in order not to stain or scratch the finish of an already repaired wall or damage the new floor.

Additional protection renovated room can serve as cellophane film (fixed with outside doors), which will reliably protect the room from construction dirt, dust, plaster, paint, and accidental damage.

Repairs will be carried out independently or with the help of specialists

You should not carry out all repair work yourself. At your request, all repair work or only particularly complex repair operations can be entrusted to qualified specialists. Firstly, experience and knowledge will allow them to carry out repair work quickly and efficiently. Secondly, you don’t have to additionally buy expensive tools that can be used to perfectly pour screed onto the floor or lay out tile.

Even if installing an interior door seems easy to you, the slightest inaccuracy is unacceptable. Of course, hang and arrange kitchen furniture, you can level the walls and do a little painting yourself. But trust more complex repair work to specialists so that you don’t have to redo it, which can significantly increase your financial expenses for repairs.

Make a list of necessary materials and tools

#1. After final design selection appearance rooms, furniture and interior, it is necessary to draw up full list necessary building materials. Their number and total cost depend on the volume of repair work and how they are carried out. If your budget allows, you need to purchase building materials with a small reserve.

#2. Separately, make a list of decorative elements: holders, shelves, mirrors, paintings, etc. Start purchasing with the selected decorative elements. If the planned decorative element is not available, you can quickly change it or create a new design option for renovating the apartment.

#3. Make a list of what you need construction tools to carry out repair work. To do this, you can use the advice of a sales consultant in construction stores or qualified repairmen.

Counting expenses

When carried out preparatory work: plans and sketches of repairs were drawn up, lists were prepared necessary materials, tools, a decision was made about the possibility self-repair or with the help of repair specialists, you can calculate the estimated total cost of the planned repair.

You should not rush to purchase all the materials when visiting your first store. In the compiled lists of materials and tools, indicate the prices of different stores, which will allow you to make purchases at the lowest cost. Carefully choose the services of repair teams. Pay special attention not only to the proposed cost of repair work, but also to the reviews of your friends about the quality of repair services.

Vacancy of premises

To protect furniture from damage, construction dirt and dust, collect it in the central part of the room. Then cover thoroughly with plastic wrap. This will free up access to the walls and ceiling. Move expensive equipment and clothes to other rooms.

Where to start renovating a separate room and what is the order of work

Repair work should begin with the dustiest ones: replacing window blocks, window slopes and installing new window sills. This will avoid dirt and dust during painting work, when it is forbidden to open windows to avoid temperature changes and increased humidity. When windows, slopes and window sills are installed, cover them with plastic film or hardboard to avoid accidental mechanical damage and pollution.

Mark the installation locations for additional sockets, make eyeliner electrical wires. At this stage, do not install sockets or connect them to the panel.

In case of use welding work(for example, when replacing heating radiators), do them simultaneously in different places in the apartment to quickly complete this dusty and difficult stage of work, sometimes including breaking down walls.

Before repairing walls, floors, ceilings, it is necessary to check their condition with a laser or water level. Start by applying the thickest layers of mortar. While they are drying, you can perform other minor repairs without downtime.

After completing this preparatory stage, proceed to repair work, performing them in the following sequence: repair of the ceiling, walls, floor. First, work is carried out using putty, cement, gypsum mixtures. Then they begin work on installing the floor, doors, and slopes.

Final repair work:

  • Pasting or painting the ceiling.
  • Wallpapering or painting the walls.
  • Installation of flooring.
  • Installation of skirting boards, thresholds, platbands.

Video: What you need to know before starting an apartment renovation

srbu.ru

Where should you start renovating a room?

Room after renovation

"Do you have a plan, Mr. Fix?" This is a phrase from a previously very popular cartoon. But it contains the answer to many questions. So, if you don’t know where to start renovating a room, then think about what you want to do in this room and make a plan for the work to be done.

The general order of work in the room is published on this site, but in addition to the order of all the work that we have planned, we need to know whether we have enough money to carry out the repairs. And for this you need at least a primitive estimate for Finishing work in the room. You can see how to draw up an entire estimate for finishing work on this website.

What materials will be needed for renovation in one room?

Studio room

So, you already know what you want your room to look like. Make a simple estimate for the costs of purchasing materials and paying specialists for work that you cannot do yourself. You can see how to draw up an estimate for repair and construction work here on this website. For now, let's just look at what materials you'll need for the renovation so you can include them in your estimate.

You will most likely need plasterboard sheets only for installing the ceiling, since installing plasterboard sheets on the walls takes up free space, and we don’t have much of it. So you need ceiling plasterboard.

Since the drywall needs to be attached to something, you will need to make a frame, for which you will need CD profiles, UD profiles and fastening brackets for the profiles. To assemble the frame and hang the sheets, you will need dowels and screws. You will also need baguettes.

You may want a ceiling made of MDF panels. In this case, you will need the MDF panels themselves and decorative strip to go to the wall. The frame for MDF panels is usually made of slats. To do this, you will need slats and, again, mounting brackets for attaching the slats. To assemble the frame and the entire ceiling you will need dowels and screws. And to attach MDF panel to the rail, you will need clamps.

Laminate floors in the room

To putty walls and ceilings, you will need two types of putty - starting and finishing. Before applying the putty to the surface, a layer of primer must be applied to it. And to complete the putty work you will need paint.

If you decide to lay laminate floors, then you need to prepare a subfloor for them. And this, as a rule, is pouring a screed, for which you will need sand and cement, and in order for this screed to be level, you need beacon profiles. And to lay the laminate itself you will need a substrate, and to complete the floor - a plinth.

If you want to glue wallpaper, then you will have to level the wall with starting putty, for which you will need beacon profiles and a primer. To apply wallpaper directly, you also need a primer and, of course, glue.

You may need to replace your window and interior door. The cost of the window includes all components and labor, but to install the door you will need a door frame, hinges and a lock. You will also need screws of different lengths, dowels and polyurethane foam.

You may want something different that is not on this list. But the principle remains the same - in order to hammer a nail into a wall, you need not only a nail, but also a wall and a hammer.

Beginning and brief sequence of repairs

Wallpaper in the children's room

Based on experience, I can say that it is best to replace the window at the beginning of the renovation. Then start cleaning the walls, ceiling (if you putty on the slab) and dismantle the old floor. Then fill the screed. Do the wiring and install the door frame. You will hang the door later.

Swipe rough finishing walls (starting putty) and make slopes on the window, and then work on the ceiling. Finish the ceiling until the end, right up to painting and glue the baguette, and only after that proceed to the finishing of the walls and slopes. Lay the floor and then hang the door. Install sockets and switches after finishing the walls.

Think about design and redevelopment

At the very beginning, decide what you want to see in your apartment: what its design will be, the arrangement of furniture. Where will there be blind and where will there be light zoning partitions? To ensure you don't forget anything, get your ideas down on paper or in a spreadsheet. Consider your long-standing desires: when else can you make them come true if not now? This could be replacing old windows, installing heated floors, or remodeling.

Decide what you are not willing to give up. Often, it is precisely these fundamental desires that people start from when they think about the arrangement of furniture and other details. For example, the decision to turn a wide window sill into a relaxation area may entail remodeling the kitchen unit. Adjust the written points by comparing them with real possibilities.

Write out the work plan

List everything that needs to be done. In the next column or a separate table, make notes: a shopping list, the approximate cost of materials and services of craftsmen.

Create a budget for the entire project

At the same stage, draw up a schedule for the delivery of materials. Downtime will increase costs, and disruption to the sequence of work will negatively affect the result. If you are out of the previously planned amount, decide what you can save on and what you definitely can’t. For example, inexpensive wallpaper is easier to replace after a couple of years than cheap linoleum that has become unusable.

For an approximate budget, it is also wisest to seek help from designers, architects or builders. They will help you estimate the amount of work and funds that will have to be invested. They will determine the state of utilities, the degree of wear of the screed and, based on the data obtained, will develop an estimate that will be useful even if the repairs are planned to be carried out on their own. Such services are not free, and there is a temptation to refuse to assess the condition of the apartment, hoping for chance. This decision can hardly be called reasonable - you will have to be prepared for unpleasant surprises and, as a result, unforeseen expenses.

How can you reduce costs?

We offer you 10 tricks that will help reduce the cost of the project with almost no damage to the future interior.

  • Lay the heated floor only on open areas rooms. But keep in mind that rearranging will not work.
  • Consider what you can do on your own or with the help of friends, and what you will definitely need a specialist for.
  • Reduce costs on double-glazed windows and interior doors by purchasing products of standard sizes in a standard configuration. Make sure in advance that the openings meet these requirements.
  • Stationary plasterboard structures will cost several times less than sliding glass, stained glass and radius partitions. But sliding interior doors will not be much more expensive than swing doors.
  • may cost you 10-20% less if you buy it online. Upon receipt, check the completeness and quality of the devices.
  • Apply primer to the surface before painting. This will help reduce paint consumption.
  • Find plain wallpaper - you can buy it almost “on a budget” basis, since there will be little waste. But a drawing, especially a large one, requires a reserve of 20-30%, which sometimes takes a significant toll on your wallet.
  • Not very expensive, but beautiful flooring -. Outwardly, it can be practically indistinguishable from oak boards or piece parquet, the price will be significantly lower. In addition, laminate flooring is extremely simple even for beginners, which means installation will be very inexpensive or you can do it yourself.
  • To save on tension and hemming fabrics, order simple design, without cluttering levels and curved lines.
  • You can reduce the cost of laying tiles by purchasing the remnants of different collections at a bargain price. Why not put them together into an original “patchwork quilt” and decorate part of the bathroom with it? If the rest of the space is tiled with neutral light tiles, the interior will look impressive.

Walls almost always have to be leveled - builders rarely achieve strict verticals and right angles. Quite a lot of plaster and putty may be required. You should not choose cheap mixtures - there is a very high risk that low-quality materials will soon begin to crack and crumble. If the walls are too far from the ideal geometry, it makes sense to abandon plastering them altogether and level the surfaces with drywall. Most likely it will be more profitable.

Once you have a final budget and list of changes, you can begin to take action.

Buy materials with a small (about 10%) reserve. Additional trips to the store or to the market are fraught with time and financial losses. Unused surplus can then be returned to the store using a receipt.

Find workers

Some processes are too labor-intensive and will take a long time to complete on your own. For example, dismantling partitions. No special qualifications are required for this, so people will be found quickly. But sometimes it’s better to entrust the installation of plumbing, wiring, and heated floors to specialists.

Finding them is not an easy task, and it is difficult to give any recommendations. Those for whom savings are important choose private teams, usually relying on word of mouth. That is, recommendations from those who have already collaborated with these masters and are satisfied with the result. Most likely, you will have to cooperate with such masters only by verbal agreement. If something goes wrong, it will be impossible to obtain compensation from them.

Official ones are more expensive, but the relationship between them and the customer is built on the basis of a contract, which clearly states the rights and obligations of the parties. In addition, according to the consumer rights law, they provide a warranty for a period of one year.

Give builders information in advance about all plumbing fixtures and their features. At this stage, detailed information from the architect-designer will be very useful.

Make a measurement plan and visualization

Measure the rooms and make them. Or entrust this task to designers. They also measure each room taking into account communications and provide you with several options planning solutions already with the arrangement of furniture.

When you choose a project, it will be worked on stylistically. To have a clear idea of ​​what your home will look like, you can order sketches or 3D visualizations using graphic editors. The last option is preferable for difficult decisions(space reconstruction, built-in furniture, complex ceilings, many details). Visualization allows you to get a visual, realistic image of rooms from all possible angles, but it is quite expensive and for simple solutions just unnecessary.

After the project is approved, the specialist will make detailed drawings that can be used by contractors in the future. As a rule, it takes 2-3 weeks to create a design project from start to finish.

Stages and sequence of major repairs

If you live in an apartment, it is better to carry out repairs sequentially: first in one room, then in another, so as not to spread dirt around the house. They start from the room where the most garbage is expected. This is usually a bathroom, as tiles are often laid in it. Then they move into the back room and move towards the kitchen.

Furniture and things will have to be disassembled, packed and taken out to other rooms, some sent to the country house, to the garage, and some thrown away.

Dismantling old coatings

This stage is relevant only for a secondary fund. Removing old wallpaper, flooring, plaster, tiles, and windows may take one to two weeks. You also need to remove switches, sockets, doors, and plumbing fixtures. Entrance and interior openings are covered with thick film.

Are you planning a redevelopment? The demolition of partitions, the installation of new openings, and the dismantling of the old plumbing cabinet is being carried out right now. Please note: such transformations are considered redevelopment and are possible only after appropriate approval from the housing inspection.

After dismantling there will be a lot of bulky waste. They should not be thrown into the garbage disposal or regular trash can- violation is fraught with administrative penalties.

Construction of new partitions

If a solid wall is needed, brick or tongue-and-groove blocks are used. If you need lightweight design, which visually separates one zone from another, enough sheets of drywall attached to metal frame.

Hollow or porous bricks will require more labor. It will be faster and easier to build partitions from cellular concrete blocks. Construction from tongue-and-groove slabs and gypsum boards will take the least amount of time. Please note that block and brick structures are placed on concrete base floors, plasterboard - on the finished screed. Duration - 2-3 weeks.

Entrance door installation

If necessary, adjust the openings: increase or decrease them. To meet deadlines, order in advance (preferably with spare rough panels). Dismantling old design and a new one will take only one day.

Experts advise installing two locks - a cylinder lock and a lever lock. We recommend giving the work crew only the key to cylinder lock. Subsequently, it can be recoded or the core replaced. By the way, in most companies this service is absolutely free.

Electrical work

The sequence begins with this step. It includes gating of walls, installation of electrical installation products and electrical panels, laying of TV, Internet and telephone cables. With a completed project, you will need five to ten days.

An electrical project is developed by an authorized organization that has the appropriate license. Next, it will have to be approved by supervisory and regulatory authorities in order to obtain permission for implementation. And after completion, you need to draw up a contract for electricity supply and a subscription book.

The approval authorities are the local authorities of Rostechnadzor and the energy sales company. They need to provide documents.

List of documents

  • The act of delimiting the balance sheet and operational responsibilities of the parties.
  • Technical conditions for connection to the electrical network, indicating the allocated power and a diagram of connecting the facility to the distribution board.
  • Floor plan with indicated location of lamps, sockets, switches, distribution devices and electrical wiring.
  • Ready project power supply of the facility.

Development and approval of an electrical project is necessary if there is an increase in energy consumption or partitions are demolished. The number of devices that can be connected to the network depends on this parameter. ​​​​​

If there is no project, then you need to think about the location of the switches yourself. To do this, you will need a design project developed at the preparatory stage - it already indicates the location of electrical appliances. Please note that the electric stove requires a special outlet. Grounding is required in the bathroom; all sockets must be waterproof.

In panel houses, it is recommended to groove the walls vertically, and do the wiring under the ceiling or near the floor. Let's make a reservation that this step only includes cutting and laying wires. Switches and lamps are installed later - at the finishing stage.

Installation of air conditioner route

In one day they will lay wires and freon pipes for you, install outdoor unit. The indoor unit is not mounted at this step.

Layout of sewerage, water supply and heating pipes

Old communications are dismantled and new ones are laid according to the layout plan for the heated towel rail, washing machine and plumbing. Install filters, gearboxes and meters, a module for hanging plumbing (if planned). Old radiators are removed and plugs are installed, new wiring is made, but the devices are not yet installed. Approximate time- 2 weeks.

Assembling new windows

It will take you one or two days depending on their quantity. Order new windows a little in advance - while they are being manufactured, you will complete the main stages. Do not remove from double glazed windows protective film until rough finishing is completed.

Please note that a number of jobs can be performed simultaneously. For example, the construction of partitions and subsequent steps. This will speed up the process.

Alignment of ceilings, windows, interior openings and walls

Duration - 1-2 months. The first in the repair sequence is the ceiling. We are talking specifically about plaster. GKL or stretch fabric installed at the very end. It is not necessary to putty and plaster the surface. The second is to level the walls, openings and slopes.

How to level surfaces:

  • First, apply a primer primer to them, and after it dries, apply a plaster composition.
  • Next, to seal minor defects - putty and finally a primer, which provides better adhesion to the finishing composition.

If for some reason the electrical wiring was done after puttying, we seal the places where the wires “lie.”

Please note that each layer must dry before the next one is applied. There is no need to rush contractors with the final finishing - all leveling layers must dry. You cannot force drying using heat guns. This measure will lead to the formation of cracks.

Once alignment is complete, be sure to check the corner geometry using . If it is broken, it may be difficult to install furniture (for example, a wardrobe). Uneven joining of floor slabs makes leveling the ceiling a time-consuming and expensive process.

You can reduce the time it takes to level walls and ceilings using plasterboard structures. In this case, before finishing, you only need to putty the seams between the gypsum boards and prime the sheathing.

Floor screed

The process will take no more than three days. Composition on cement based sets in 12-24 hours, on plaster - 3-4 hours. Tiles can be laid on a gypsum screed after 3 days, and linoleum, laminate, carpet or parquet - after a week. The floor covering is laid on the cement-sand screed no earlier than after 2 weeks.

There are technologies for prefabricating on a slab basis. The name itself suggests that no time is required for hardening and drying, which means the time is reduced. Experts include sensitivity to flooding as a disadvantage.

Installation of heated floors

Place on a flat base. Only allowed in apartments electrical system. It may take 30-45 days to arrange it. There is also a heating system based on mats - it can be installed in 8-10 days. Film heaters are the fastest to install, they can be installed in 1-2 days.

Continuation of electrical work

Installation of socket boxes and internal parts of sockets and switches usually takes place within two days or a week. This step is not recommended to be carried out earlier, since when leveling the surface it will be difficult to guess the depth at which the socket or switch needs to be installed.

When should garbage be taken out?

First of all, waste must be stored. Pieces of old wallpaper can be assembled into ordinary plastic bags. For tiles, plaster and broken partitions you will need strong bags. They can be purchased at any construction supermarket. But where should we put what we have collected? In some new buildings, this task is taken on by the management company. She enters into a subcontract agreement with transport company which removes waste. The cost of its services is distributed among residents. However, more often the issue has to be resolved on its own.

The easiest option is to contact the waste removal company directly. In this case, you get rid of any hassle associated with disposal, but you should keep in mind that you have to pay for this service. And since it is expensive to call a car for every two or three bags, you will have to provide a place in the apartment for construction waste so that you can then remove it all at once.

Finishing the ceiling

Painting usually takes three to four days. It is recommended to paint only smooth slabs, with small differences. Install hanging or tension structure it can be done in one or two days, provided that several people will do it. Pre-install the mounting brackets for the lamps. At the same stage they are installed ceiling skirting boards, stucco.

During a long break in work, the paint on brushes or rollers will not dry out if you place them in a tall container of water.

Finish wall covering

You can bring beauty in either ten days or 1.5 months. The period depends on the selected materials. Use paint, decorative plaster, porcelain stoneware, metal or wooden mosaic, glass tiles, tile. The most popular is wallpaper. To prevent them from becoming deformed, after sticking them, do not open the windows for two to five days.

Wallpaper is glued at temperatures above 10°C and humidity no more than 65%, at closed windows and doors to avoid drafts. Glue the canvases starting from the window.

Radiator installation

Install when the walls are ready. Otherwise, painting the space behind them or covering it with wallpaper will no longer work. The work will take 1 day. Don't forget to contact us in advance management company with a statement to turn off the heating system.

Plumbing installation

A bathtub, shower cabin, toilet, washbasin, faucets, and washing machine are installed (if you plan to place it in the bathroom). Duration: three to five days.

Floor finishing

It is extremely important that at least 14 days have passed since the screed was poured. Better - 28. This is exactly how much is needed for moisture to evaporate from concrete. Otherwise, water vapor, rising, will penetrate the materials and destroy them. And if ceramic tile will withstand such tests, the parquet or laminate will be damaged. Laying floor coverings (parquet, laminate, tiles, etc.) takes an average of 2 weeks.

If you laid the flooring before finishing the ceiling and walls, cover them with film to prevent them from getting dirty.

Installation of interior doors

Before ordering them, you need to know the height of the flooring. Otherwise, there may be a large gap under the canvas or the box may not fit into the opening. The period will be one to three days.

If you are not replacing old interior doors with new ones, then during the work it is better to remove the panels and take them to a room where it is not so humid. Otherwise they may swell.

Arrangement of headset and household appliances

Within one to two days the assemblers will install furniture modules, countertop, stove, hood, dishwasher and washing machine, washing, which is specified when ordering the set and is fixed in the contract.

Installation of floor heating thermostats

The sequence of renovation of a bath, kitchen, or any other room is the same. First, the coatings, if any, are dismantled. Then - wiring of communications, leveling of surfaces and at the very end - finishing.

Stages of cosmetic repairs

Here you will need individual approach, since each apartment has its own nuances. In some places you just need to re-glue the wallpaper, in others you only need to re-lay the floor, and in others you need to update the entire interior, but without leveling the surfaces, replacing jambs and wiring. Let's write down a rough action plan.

Purchasing materials

At this stage, chandeliers and the front part of sockets and switches are removed. Internal elements sealed with masking tape.

Removing old materials

This process may take several days, or even weeks. Depending on the number of square meters. You need to remove everything that you decide to update.

Leveling surfaces

Now you need to eliminate the unevenness - putty them. Afterwards, primer and plaster are applied to smooth surfaces. You always have to start from the ceiling. Then there are the walls and floor.

The final stage

Painting, pasting and laying of new materials are carried out in the same sequence as in the previous stage. At the very end, the electrician is put back, the furniture is placed and Appliances.

The video clearly shows the sequence of wall repairs.

  • Cleaning and filling of potholes.
  • Laying wires and sockets.
  • Primer and pasting.

Now you know everything about the repair sequence: where to start, how to reduce the cost, etc. Let's talk about how to protect yourself from force majeure that may arise during large-scale home renovations.

Bonus: Repair insurance

Few people think that installing new communications can harm their neighbors. But it is enough to recall the stories of experienced people about the floods that occurred during the implementation of the project and caused damage to more than one apartment, and the question immediately arises of whether it is possible to protect yourself from scandals with residents and payments of material compensation.

There is a saving grace - this is civil liability insurance for the duration of repairs. Such a program assumes that if damage is caused to neighbors’ property, the insurance company will cover the losses. When it comes to light cosmetic finishing, such a policy will not be so relevant.

If your plans include reconstruction, pipe replacement and other major renovations, insurance should be one of the first mandatory items in your program. By the way, a similar agreement is drawn up after the redevelopment is completed - who knows what force majeure will happen.

Although repairs are considered a natural disaster in terms of the level of their mental impact, physical exhaustion and loss of money, you need to approach them dispassionately, armed with plans, sketches and calculators. As with any process, there are detailed step-by-step instructions describing the sequence of apartment renovation, compiled on the basis of the centuries-old, long-suffering experience of more than one generation of home repairers.

The stages of repair should not be carried out spontaneously, but in strict sequence

Sequence of apartment renovation: step-by-step instructions

Each point of this instruction is watered with sweat and blood:

falling bricks, fingers corroded by cement or beaten off with a hammer, flying electric saw blades - this is approximately what can await daredevils who decide to master the science of repair.

Much will not work out right away, and a number of completed works will have to be redone later.

But it’s a shame that most of the alterations arise due to the fact that people do repairs in completely the wrong order. Without this, home repairs would happen several times faster.

What is the sequence of apartment renovation?

We will divide all work into several stages:


Before the renovation begins, a sketch of the future interior of the apartment is drawn up
  • This is very convenient for those who are not in a hurry to do everything in an emergency and are short on funds
  • You can purchase everything you need before each stage.
  • It is better to take a break from work between stages.
  1. We start with the awareness of what we want to get in the end:
    • Cosmetic or major option
    • With what comfort levels:
      • unpretentious (ordinary amenities, nothing leaks, nothing blows from anywhere)
      • increased comfort (luxury plumbing, climate control, sound insulation, etc.)
  2. We draw up a layout with the choice of interior items and their arrangement.
    There may be several options:
    • Contact a professional designer
    • We use simple standard 3D programs for repairs, for example, Sweet home 3D or Ikea
    • We draw a sketch ourselves using a graphic editor or on a regular sheet
    • We make calculations of working surfaces
  3. We make a detailed list of everything you need to buy:
    The list includes communications and furnishings, rough and finishing materials and construction tools.
    You can't skimp on tools:
    Yes, availability construction mixer will significantly speed up screeding of floors and plastering of walls and ceilings
  4. In order not to miss anything, we get acquainted in detail with the technological process of each stage
  5. We purchase materials and tools

Rough repair work

  1. Dismantling and installation of walls and partitions
    This work is usually carried out by those who are not satisfied with standard layouts, with the goals of:
    • increase living space(by connecting the loggia with the hall or kitchen, removing niches, etc.)
    • make a shared bathroom
    • show off something unusual beautiful arches, walkways, etc.

    It’s just a shame that when carrying out such dismantling, lovers of major demolition of buildings inadvertently demolish load-bearing walls, as a result of which they create the danger of the building collapsing during earthquakes or explosions

  2. Wall slitting and communication lines:
    • Holes are made in the walls for water supply and sewer pipes, grooves for electrical wires
    • Electrical wires are stretched throughout the apartment to the designated sockets, switches, ceiling lighting and lead out to the common corridor electrical panel
    • At the same stage, cables for air conditioning, television and Internet are laid.
      You can, of course, lay it later, but again you will have to cut passages in the walls, or run wires over the top, so that you can then forever get confused in them and stumble
    • Do not forget that high-power electrical appliances (electric furnaces, boilers, air conditioners) are connected with three-core power cables
    • Sewer pipes are being laid out from the common riser to the kitchen, bathroom, toilet
      This is a very important point. Make sure again that
      • you will not change the location of the kitchen sink in your layout
      • you will be installing a bathtub, not a shower stall
      • the type of toilet you choose is final
        (Connection of floor-mounted and wall-mounted toilets is different)

      The toilet can generally be purchased in advance and immediately connected. This eliminates the inconvenience of repairs . Then, when it’s time to work on the toilet, it can be dismantled again for the period of laying tiles.
      During European-quality renovations on initial stage they use a so-called rough toilet, which is changed at the end.

      If plumbing has not yet been purchased, then put plugs on the pipes to avoid leaks and odors from the riser

    • Water pipes are connected in the following sequence: first hot, then cold.
      If the project does not provide for hot water, then the connection of hot water should be postponed until the renovation of the room where the boiler will be installed is completed.
      And only now we start plastering
  3. Plastering works
    Applying plaster to walls
    • Plastering walls and grouting ceilings (leveling walls and ceilings
      Plaster can be replaced with plasterboard
    • If a room is being soundproofed, sound-absorbing material is first applied.
    • Alignment of door and window slopes
  4. Pipe connection central heating to the battery
  5. Primer of pipes
  6. Interior carpentry work
    • Manufacturing of built-in cabinets and shelves
    • Primer
    • Installation of interior door frames
  7. Bathroom and toilet work
    • Waterproofing and floor screed
    • Floor and wall cladding
    • Installation of a bathroom (if the bathroom is adjacent to the wall, then its installation is carried out after the wall is covered)
  8. Floor screeding in other rooms
    • If the floors are insulated, the insulation is poured before the screed
    • In addition to concrete screed, dry screed based on expanded clay and Knauf is also used

Finishing work


The final stage

  1. Installation of switches, sockets, lamps, plumbing fixtures
  2. Kitchen furniture assembly
  3. Installation of skirting boards
  4. Installation of interior doors.
    When renovating, they often make the mistake of installing doors at the very beginning.:

Doors obstruct the entry of large objects, so they are often scratched and damaged.

And here doorjamb(box) is installed first, since the space between the box and the wall will need to be plastered.


Connecting lighting, installing skirting boards and interior doors occurs at the final stage

In this step by step instructions contains a list possible works, if you get a practically bare apartment.

In practice, much of this list may not be useful to you, since communications in new buildings are even draft usually carried out.

Residents also do not always install soundproofing and floor insulation, but living in an apartment building panel house often makes you regret some omissions that should have been made at the very beginning.

You can determine the sequence of apartment renovation yourself, guided by feasibility, planning, timing and financial capabilities.

Main condition:

Any subsequent step should not lead to corrections of what was done at the previous stage.
If this condition is not met, then the repair sequence is chosen incorrectly.

Video: Stages of European-quality renovation

You are young, energetic, lucky. It’s at least ridiculous to be afraid of the upcoming renovation in the apartment you just purchased, it’s a joy. In the parental home, the sequence of major renovations of the apartment was discussed many times. You are aware of all the pitfalls. Moreover, the problem of inconvenience of living in an apartment undergoing renovation is completely eliminated. You don’t need to take furniture or expensive equipment somewhere to protect it all from construction dust; when tiling a toilet, temporarily connecting the toilet a hundred times, etc. All this is true; the advantages of renovating an empty apartment are undeniable. But to fall into euphoria, no matter how small the problems may seem in comparison with the happiness of owning your own square meters, we won't for now. There is time to discuss everything again and think about the sequence in which to carry out renovations in the apartment.

Apartment from old housing stock

When purchasing living space in an old house, you probably assessed and took into account all possible further costs for it. In many ways, the sequence of work when renovating an apartment in in this case depends on its condition and the age of the house.
If your funds allowed you to make an acquisition only on the first or top floor, first of all, you need to find out when the utility workers last carried out major repairs of the roof, pipes in the basement and along the riser. To eliminate roofing and pipe problems, it is necessary to take into account the cost of time and nerves in case of contacting responsible for these parts of the building to the utility company. Or considerable funds if you decided in advance to rely only on your own strength. Additional items are included in the sequence of work when renovating an apartment from an old housing stock, but they must be completed first so that the renovation in your apartment does not become a victim of the autumn rain or “good” neighbors.

Attention - redevelopment

In houses from the last century, partial or complete redevelopment is most often planned. Before you start changing the internal space, you need to get permission to do so. This process is difficult, slow and quite expensive. It shouldn't affect load-bearing walls, frame elements, ventilation ducts, cold and hot water supply risers. It is also prohibited to move sewerage and gas supply pipes, batteries to balconies and loggias, or to install a heated floor system from common system heating. Unauthorized redevelopment can cause a lot of trouble for the apartment owner, and legal proceedings are possible. Therefore, when planning this type of work, you need to weigh the pros and cons. There is no need to worry if you are planning to simply tear down the old built-in cabinet or re-wire the interior.

List of works with cost estimates

When starting any renovation, you need to clearly understand the end result. You need to decide on everything down to the smallest detail. It is better to mark directly on the apartment plan where, what will stand, hang, lie, move, etc. This is necessary for choosing correct option placement of heating system devices, optimal wiring of electrical, television, Internet cables, provision of a sufficient number of sockets in the right place, etc.

For correct wiring water supply pipes in the bathroom and kitchen, it is important to know the placement of all plumbing fixtures, washing, dishwasher and so on. The answer to the question of what sequence of apartment renovation depends on all this. It is necessary to draw up a list of all works and a list of materials for them. Carry out accurate measurements in rooms and services and draw up estimates of quantitative costs for materials, plumbing, heating, gas, electrical and other goods and components for repairs. Everything needs to be taken into account down to the last screw.

Next, using the Internet or the old way, visiting construction markets and supermarkets, they monitor prices for everything that is in the plan, including services construction crews or individual craftsmen, not forgetting the cost of dismantling everything that requires replacement and garbage removal. Based on the collected data, a complete cost estimate is drawn up and the financial possibilities for the calculated needs are assessed. In fairness, we must warn that it was at this stage that many major repairs from construction companies turned into a sequence of do-it-yourself apartment renovations.

Work plan

The material side of the repair has been resolved. The type and performers have been decided. You can start developing a plan. Work is carried out in descending order from the dirtiest and dustiest. Fulfilling an order for the production of new windows and doors usually lasts from ten days to a month, so it is necessary to coordinate the timing with plastering and painting work. Some plumbing fixtures or rare materials may be out of stock. This also needs to agree on delivery time. In short, first of all, it is necessary to make all orders and purchases according to the estimate. Let's make a reservation that reliable companies take care of this, giving you the right to aesthetic and artistic choice.

According to the rules, they must conclude an agreement with you, including a work plan and their cost, as well as an estimate of material costs. This is where your preliminary calculations will come in handy. To trust without checking is, to say the least, unwise. Without taking into account the fulfillment of orders for finishing materials, old pipes, radiators, tiles, plumbing fixtures, baseboards, wallpaper, and interior doors are dismantled. At the same time, repair work is being carried out on the balcony and loggia. Then they make a new wiring of all pipes and cables of the electrical network, condensation and dust collection systems, and install heated floors. Then you can lay tiles on the walls and floors in the kitchen, bathroom, toilet, and install plumbing equipment in them.

After installing new windows and the front door, all internal and external slopes are sealed. They install the planned plasterboard structures, level and plaster the ceilings, walls, and floors. If you need a new floor screed, you need to take into account that its drying time lasts up to a month, depending on the thickness. When the walls and floors are ready, the heating system and interior doors are installed. Then comes the work of gluing wallpaper and laying linoleum or other flooring, installing sockets, lamps, baseboards, and connecting stationary equipment.

Apartment in a new building

You can be called lucky if it was accepted from the developer after a thorough and comprehensive inspection. Your knowledge in this matter can significantly adjust the sequence of renovation of an apartment in a new building. Carry out the inspection during daylight hours, and to inspect storage rooms, sewer and water pipes and other dark problem areas, use a flashlight. He will also help you when checking the entrance, elevator, landing, garbage chute. Yes, it is with these services that you need to start your inspection, or rather, even earlier you need to walk around the yard, check all the approaches and exits. If there is a lot of hackwork, then the apartment most likely has a lot of defects, and there is a lot of work to be done.

Repair acceptance plan

Remember that before signing the contract, all defects identified by you in the presence of the developer must be eliminated at his own expense. In order not to immediately study the sequence of renovation of an apartment in a new building, check everything carefully with your own hands. Start with the entrance and interior doors - the latter often like to close spontaneously. You will understand that this is a marriage, and not a minor trifle, when you get tired of propping them up with something all the time. Check windows, slopes, and ebbs even more carefully. Feel free to lean on the windowsill. If the attendant does not wince when you climb on top of him with your feet to check the tightness of the windows from above, then everything was done according to technology.

Everything that could be measured during the calculations in the contract must be remeasured and the areas recalculated. To check the verticality and horizontality of surfaces, plumb lines and levels are needed. The floor screed is checked for strength; sand should not be released on it. Even more important is the strength of the seams at the junctions of wall panels, ceilings, floors, especially external joints - this is a matter of the tightness of your apartment. In new buildings, only plastic pipes are now installed in the water supply and heating systems. There should be no leaks or dampness where they enter your apartment. Check the operation of all stopcocks and valves, the temperature control system, if it is installed on batteries. They and all plumbing fixtures should be checked for leaks or blockages. The draft in the ventilation duct can be checked with a lighter.

It’s not enough to see that all the sockets in the rooms are located at the same level from the floor; you need to check the operation of each one; take with you a small electrical appliance and a lamp to check the lighting. When the device is turned on, the counter should work. If you buy an apartment with finishing, then check the quality of the wallpaper, how the tiles, linoleum or other covering are installed, and how the baseboards are installed. All of the recommendations listed are needed to accept the results of major repairs from the construction team.

When is it better to postpone repairs?

It is known that new house The first two years are subject to subsidence. At the same time, cracks may appear on the walls, slopes, and windows, doors, etc. may become damaged. Repairs by neighbors on all sides lead to similar consequences. Therefore, if the apartment is rented out without finishing, it is better to do it first inexpensive repair with your own hands. But bear with the “not your” wallpaper and tiles, maybe they will come off on their own, and in a couple of years everything will be done to the highest standard.

Basic mistakes during repairs

Even cosmetic renovations should not be started without a plan and cost estimate. If you decide to entrust all the work to a team of builders, then it is safer to trust a trusted one who has recommendations from your family or good friends. An agreement with a schedule of work and purchases of materials should be concluded with the most reliable team. Reputable companies submit these documents along with estimates without your reminder. You have the right to arrange a casting for teams and choose the one that suits you best in all respects. The work of any craftsmen must be personally supervised. You need to come and be sure to monitor how the holy of holies of repairs are being carried out - consistency, whether there are any complaints from neighbors, whether garbage is removed on time, etc. All this is in your own interests, in addition, this will allow you to take into account all expenses on time and correctly. But neither yourself nor the craftsmen who purchase them should allow yourself to skimp on the quality of materials.

Designer renovation

For this type of repair, the most important thing is an integrated approach. The implementation of an individual design project for your apartment should involve specialists who understand and complement each other. This happens if the conceptualist, designer and builders work for the same company.

And if you can’t afford another designer extreme in a couple of years, then it won’t hurt to remember in time the fickleness of fashion and the wisdom that comes with age.

L Anyone who has ever faced the need to renovate an apartment, a house, or even one room, knows that a situation often arises in which the work already done interferes with subsequent operations. And how long it takes to find a way out of the situation, wasting time, and often negating the work of the previous hours. , what does this sequence depend on, how is it related to the type of premises and the complexity of the repair? We will answer all these questions here. But first, let’s consider such a strange combination as the sequence of repairs in a new building.

Content

1.
2.
2.1
2.2
2.3
2.4
3.
4.

Sequence of repairs in a new building

Strange as such a phrase may seem, it will not surprise a person who witnessed the construction of the Soviet era, not one iota. Yes and modern construction Often he sets exactly this task for a new resident - to repair what has just been built.

In fact, there is nothing surprising here, because repair work is absolutely similar to general construction work and differs from them only in the need for preliminary dismantling of old structures, eliminating the consequences of any destructive influences, etc. The same, or pasting surfaces with wallpaper (or), with From a technological point of view, both during repairs and in new construction, they are absolutely identical. And newly constructed buildings (unless the building was designed in detail taking into account the requirements of the future tenant, moreover, was built under his personal, at least periodic control) to one degree or another will be subject to alteration, consider repair. Before, during, or after check-in, it doesn’t matter.

Sequence of renovation of living rooms

Let's start the sequence of apartment renovation with the simplest, or rather general version and consider the sequence of renovation of a living room. Since, as already mentioned, repairs are not much different from new construction, the start of repair work will be to bring the premises being repaired to a state similar to what it would have been in before the installation of the structure to be repaired. Simply put, if we decide to change the wallpaper, then the room must be brought into such a state as if the wallpaper had never been there.

Preliminary stage of renovation of living rooms. Vacancy of premises

At the preliminary stage of work, we clear the room of all interior elements that can be removed, disassembled and taken out without the use of tools that are more complex than a regular screwdriver. After the room is empty, we carefully inspect the condition of the elements that form it. There are not many of them. Firstly, building construction, which include door and window fillings, finishing elements, floor structures (base, covering, baseboards, etc.), wall and ceiling structures. Further - network engineering, usually limited and, less often, supplemented by a centralized ventilation system. Finally - built-in furniture.